ST GILBERT'S CHURCH OF ENGLAND PRIMARY SCHOOL Published 31 Jan 2025 Contracts Finder

key details

Value£30,000
Statusactive
Category (CPV) 44100000 +7 more
Deadline14 Feb 2025
Contract start20 Jul 2025
Contract end31 Aug 2025
Procedureopen
SME suitableYes
OCIDocds-b5fd17-7907bf0d-2abd-457f-8655-2bd3a5fce681

description

  1. Introduction
  1. Company Background

St Gilbert's Church of England Primary School (known as 'the School') is a standalone primary academy. Academy status was granted in January 2013.

Located to the West of the historic town centre of Stamford, the school currently has 300 pupils form 4 - 11 years of age.

The current school buildings were established in the early 1970's with a further addition at the beginning of the 2000's.

'The School' is currently rated 'Good' by OFSTED

  1. Project Background

The existing outdoor play area was installed circa 2008/9 and included:

Wet pour safe play surface throughout
Outdoor secure storage for resources
Activity areas and play equipment

The equipment is now at the end of its economic life and 'the School' are looking to redesign the existing area with a space that is inviting and inspirational for the pupils in the Reception phase of the school

  1. High Level Overview of Requirements

Bidders are asked to submit a formal tender for the redevelopment of the Early Years outdoor play area

.

  1. Existing Provision The existing provision has the following equipment installed:
Wooden picket boundary fencing
Wet pour safe play surface throughout
Central climbing frame and slide
Sand pit
Mud pit with activity panels
Secure storage for outdoor resources
Raised bed planter
Covered activity area

See appendix 1 for photographs of the existing provision

To create and inviting and inspirational outdoor play area for use by pupils in the Early Years (Reception) phase.

Key requirements are:

Removal/recycling of existing facilities including surfacing and timber structures
Ensuring compliant foundations for any new surfacing or structures
Design service to be completed in collaboration with 'the School'
Provision of equipment that will aid the physical development of all pupils
Provision of equipment that will encourage the joy of learning
Provision of equipment that enables creativity in play
Creative design that will enhance the natural world
A safe play surface and equipment compliant with BSEN1176 and BSEN1177
Where possible, as much of the materials to be used are from recycled or sustainable sources
Provision of a full maintenance schedule
Use of qualified/registered installers
All contractors to be DBS checked

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
31 Jan 2025 Tender (tender) · 15e73579-c9ce-4ede-a999-b77dc2a7142a-822028

more from ST GILBERT'S CHURCH OF ENGLAND PRIMARY SCHOOL

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.