key details

Value£47,475
Statuscomplete
Category (CPV) 50620000 +8 more
Deadline16 Aug 2021
Contract start10 Jan 2022
Contract end9 Apr 2022
Procedureopen
SME suitableYes
OCIDocds-b5fd17-7592665c-23ea-4b24-b6c0-abe20ee34d34

Award

SupplierValueDateStatus
The Concrete & Corrosion Consultancy Practice Ltd £47,475 7 Jan 2022 active

description

Following the fire and failure of the cladding systems fitted to Grenfell Towers in London. Bristol City Council engaged it's own surveying specialists to evaluate the External Wall Insulation fitted to it's own high rise blocks. As part of these works, 4 blocks at Barton Hill were identified as requiring further investigations. these blocks were Longlands House, Ashmead House, Harwood House & Barton House. The preferred method of carrying out the investigations is by the use of abseil technique and the scope of the works required are:

  • Remove once section of cladding 1500mm wide x 600mm deep on each floor on different elevations at fire barrier level
  • check for fire barrier confirm depth material and mesh lapping
  • check spacing of fixings and type i.e metal or plastic
  • replace, seal and encapsulate section back in place.

more from Bristol City Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.