HS2 C1 ALIGN JV - Jetty Dismantling and Removal
key details
| Value | £2,500,000 |
|---|---|
| Status | active |
| Category (CPV) | 45244100 +4 more |
| Deadline | 23 May 2023 |
| Contract start | 1 May 2024 |
| Contract end | 30 Jun 2025 |
| SME suitable | No |
| OCID | ocds-b5fd17-73253fbe-6fe8-4d7d-a042-8cf3adbf8847 |
description
To facilitate the construction of the Colne Valley Viaduct, Align JV had to construct a temporary Jetty over the various water courses around the Colne Valley region. This was formed of a tubular piled foundation, steel frame structure, and capped with purpose made precast planks.
The works will consist of the removal of the jetty and finishes (barriers, lamp posts etc.) over water, with the tubular piles cut off below bed level of the various watercourses (piles cannot be removed completely and need to be cut down (probably from within piles)).
All materials removed will either taken back to main compound and disposed of by Align and/or removed from site and disposed of by the selected sub-contractor.
The scope will also include the burning/removal of pile cap sheet pile cofferdams to top of pile cap within the lakes.
The scope will also include the removal of temporary causeway and associated works (fill materials, tensioning bars, sheet piles (cut to ground level) and the like)
Additional information: This will be a highly sensitive operation and in close proximity to the permanent asset, so appropriate consideration will need to be taken for the type of equipment to be used and the methods. A full ITT would be issued to the shortlisted tenderers outlining the constraints.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=70832865 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/7646bbd3-f11f-46f9-99be-b749db19e712 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 12 May 2023 | Tender (tender) | · | 7646bbd3-f11f-46f9-99be-b749db19e712-644406 |
more from ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)
- HS2 C1 ALIGN JV - CSP Temporary Access Road Reinstatement and Remaining Permanent Works · £2,500,000 · 18 Aug 2025
- HS2 C1 ALIGN JV - SHC Permanent Landscape & Track Drainage · £5,000,000 · 22 May 2025
- HS2 C1 ALIGN JV - SHC Soft Landscaping and Permanent Fencing - Rev1 · £5,000,000 · 22 May 2025
- HS2 C1 ALIGN JV - Road Construction and Surfacing · £2,500,000 · 22 May 2025
- HS2 C1 ALIGN JV - GRP Ebmankment Steps · £250,000 · 15 May 2025
- HS2 C1 ALIGN JV - Leather Lane FRC · £5,000,000 · 20 Jan 2025
- HS2 C1 ALIGN JV - Amersham Highways Drainage (Supply & Install) · £500,000 · 18 Sept 2024
- HS2 C1 ALIGN JV - Amersham Gate Supply & Install · £150,000 · 4 Sept 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- GB-London: STA1473 - Propulsion Drives Spares & Power Limitation · The Corporation of Trinity House of Deptford Strond · £71,208
- Mooring Bollard Inspections · Caledonian Maritime Assets Ltd (Utility) · £27,986
- Purchase of Polymarine Fenders · North Devon District Council · £92,043
- Replacement of Outer West Marina Pontoon, Ramsgate Harbour · Thanet District Council · £137,890
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.