SASWP49 - Track Protection
key details
| Value | £100,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45234116 |
| Region | West Midlands |
| Deadline | 11 Jul 2021 |
| Contract start | 1 Apr 2022 |
| Contract end | 31 May 2022 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-71ac585c-6126-42f6-b675-c802ad95ad0e |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| not named | £0 | 28 Oct 2021 | active |
description
Subcontractor to supply and install up to 18,000m2 (2 layers) of Trackway / Track protection to enable the replacement SAS13 Bridge to be installed over the Railway tracks via SPMTs (Self Propelled Modular Transporters).
Approx 2,300m3 trackway is to be installed over the DBP3 Rail Lines during a May 2022 Blockade.
Approx 6,700m3 trackway is to be installed in the SAS13 Site compound prior to the May 2022 Blockade.
Tenderers will be issued a formal invitation to tender (ITT) with a pricing and submission document to complete.
The submission will included a balanced scorecard requesting answers to questions (along with evidence) to be submitted for review and scoring. The highest scoring tenderers will be considered preferred tenderer for the works. High level criterial of the balanced scorecard questions will include:
- Quality
- Sustainability
- Competence
- Commercial Price
- Etc
Mid tender reviews will be held prior to the submission deadline to review the scope of works with the SAS13 project team. Following the submission deadline, there will be post tender reviews to review your submissions with the SAS13 project team.
Best and final offers may be requested from tenderers.
Skanska have been employed by Network Rail (NR) to replace the existing SAS 13 bridge to increase lateral clearance below the structure to enable the construction of HS2's new depot access lines and access to the new HS2 depot via road. The existing bridge forms the rail intersection between the Stechford to Aston (SAS) line and the Birmingham to Derby Line (DBP3).
The new bridge will be a 92m single spanning structure. Skanska's appointment by Network Rail includes the design and demolition of the existing bridge and installation of the new structure.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=56549880 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/2038d673-196f-4504-a665-8f8681dccd1f , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Nov 2021 | Award (award) | · | 31363da2-22f8-4476-a4eb-713be566453e-483747 |
more from Skanska Infrastructure (Rail)
- CP7 Framework - Clifton Bridge - Miscellaneous Steelwork · £250,000 · 24 Mar 2025
- CP7 Framework - Clifton Bridge - Site Media · £50,000 · 24 Mar 2025
- CP7 Framework - Clifton Bridge - Waterproofing · £1,000,000 · 11 Mar 2025
- WP57 - Anti Graffiti · £25,000 · 14 Oct 2021
- SASWP36 - Birdproofing · £15,000 · 26 Aug 2021
- SASWP14 - GRS Staircase, Parapets, Cess Walkways, Stairs · £150,000 · 14 Jul 2021
- SASWP10 - Pre-Cast Abutment Supply · £500,000 · 18 May 2021
- SASWP03.1 - Rail Systems - Bonding, HV, OLE · £2,500,000 · 23 Mar 2021
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Provision of Priestfield Mitigations LC084 - Phase 1 - Ballast Distribution Works for Midland Metro Limited (MML) · West Midlands Combined Authority
- Rodney Stoke Access Track Improvements · Natural England · £20,833
- Provision of Ballast Storage Area for Midland Metro Limited · WEST MIDLANDS COMBINED AUTHORITY · £34,396
- Provision of Track Baseplate Rectification Works for Midland Metro Limited - The Crescent Tram Stop · WEST MIDLANDS COMBINED AUTHORITY · £287,473
- Provision of Manual Rectification Team for Track Faults for Midland Metro Limited · WEST MIDLANDS COMBINED AUTHORITY · £114,326
- MML Low Level Resurfacing Works - The Crescent Tram Stop · WEST MIDLANDS COMBINED AUTHORITY · £357,896
- MML Rail Ballasted NEC4 Term Service Contract · WEST MIDLANDS COMBINED AUTHORITY · £954,000
- MML Tamping & Geometry Term Service Contract · WEST MIDLANDS COMBINED AUTHORITY · £879,600
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.