GB-Chertsey: Consultant Design Engineer for the Resilience, Capacity and Sustainability of the Electrical Distribution System Project
key details
| Value | £50,000 |
|---|---|
| Status | active |
| Category (CPV) | 71323100 |
| Region | South East |
| Deadline | 25 Nov 2016 |
| Contract start | 3 Jan 2017 |
| Contract end | 31 Mar 2017 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-71322bdf-adca-11e6-9901-0019b9f3037b |
description
Consultant Design Engineer for the Resilience, Capacity and Sustainability of the Electrical Distribution System Project at St Peter’s Hospital, Chertsey.
The project is to reduce the risk of power failures affecting the business continuity of the Trust at St Peter’s Hospital. The project further encompasses future anticipated capacity/demand of the electrical system to provide effective 100% standby generator back-up in 2017. Use of the national grid and generators are to be sustainable, by providing assurance of high efficiency continuing supplies for a minimum of 15 years.
The Consultant will act as Lead Consultant, Principal Designer and Site Project Manager. There will be separately appointed Cost Consultant/QS, and the Trust’s Authorising Engineer (AE) will peer review proposals. The Lead Designer/Project Manager reports directly to the Project Sponsor and the Trust Project Manager.
The Consultant will prepare a detailed Project Brief from discussions and agreements with the Trust’s Project Team and obtain Trust approval of this before committing to Design stages.
The Project Brief to be submitted within two weeks after the order to proceed with the commission.
The brief is to include a list/series of mitigating design risk options that identifies discrete actions or designs that will increase the electrical resilience of the site (or alternatively reduces the risk that power failures will have on the Trust’s Business). These options to be quantified in terms of their efficacy in increasing Site resilience along with estimated costs of their possible enactment.
It is envisaged that the successful Consultant Design Engineer will not be party to bid for the delivery of the works.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
documents
- https://www.contractsfinder.service.gov.uk/Notice/a1574d46-77ea-4f6b-af46-fb95d4c688c6 , tenderNotice
- https://www.delta-esourcing.com/delta/respondToList.html?noticeId=226745858 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Nov 2016 | Tender (tender) | · | a1574d46-77ea-4f6b-af46-fb95d4c688c6-115460 |
more from Ashford & St Peter's Hospitals NHS FT
- GB-Chertsey: Cost Advisor for the Resilience, Capacity and Sustainability of the Electrical Distribution System Project · £50,000 · 10 Nov 2016
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- CW - LV4 Sub Station Design ETA Projects · Chelsea and Westminster Hospital NHS Foundation Trust
- PCI_LotA_174 Energy Infrastructure and opportunities analysis · HAMPSHIRE COUNTY COUNCIL · £35,000
- Combined Heat and Power Unit (Falmer Sports Centre) Energy Performance Contract - AWARD · University of Brighton · £470,000
- DHC DH1320 Bridport Hospital Replacement Electrical Panel Board Design Services · Dorset HealthCare University NHS Foundation Trust · £19,090
- D1403 Replacement Standby Generator · Nuclear Restoration Services Limited (Dounreay) · £139,981
- Solar Panel Installation Design Work · Derbyshire Support & Facilities Services · £5,800
- Electrical Design For the Removal/Replacement of Substation Reyrolle HH Frames · Dounreay, a division of Magnox Limited · £42,916
- PAHT - Provision of the installation of electric vehicle charging infrastructure · West Hertfordshire Hospitals NHS Trust · £38,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.