Golborne Dale Bridge 0045 Water proofing by injection & Scour Protection Contract 2019

Wigan Council Published 9 Jan 2019 Contracts Finder

key details

Value£150,000
Statusactive
Category (CPV) 45200000 +2 more
RegionNorth West
Deadline18 Jan 2019
Contract start4 Feb 2019
Contract end11 Mar 2019
Procedureopen
SME suitableYes
OCIDocds-b5fd17-71056c89-702d-4578-b6f5-354e72c0d037

description

To carry out specialist injection waterproofing and scour protection to Golborne Dale Bridge 0045, in accordance with the performance specification and works information pack.

The contractor will design and specify the system and product to satisfy the required performance specification.

The material to be used is MC-Injekt GL-95 or similar approved, the contractor and their operatives must be licensed and approved by MC Building Chemicals to install this material.

Bridge No 0045 requires the removal of 30m³ of silt from the South side and the installation of Rip Rap scour protection, along the full length of both the North and South abutments, using limestone boulders of between 400-600mm to extend 1m beyond the bridge.

The Contractor to provide all necessary transport, tools and equipment and access, appropriate welfare , water disposal and clearance on completion in order to carry out the works effectively.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
9 Jan 2019 Tender (tender) · 69ed4041-ed8b-4aa8-a859-3e5a897e6c24-262541

more from Wigan Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.