Under Track Crossing of Utilities - Old Oak Common (S4) Station - HS2
key details
| Value | £10,000,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45221200 +2 more |
| Region | London |
| Deadline | 9 Jan 2020 |
| Contract start | 16 Mar 2020 |
| Contract end | 7 Dec 2020 |
| SME suitable | No |
| OCID | ocds-b5fd17-70e61151-0701-4d7b-92af-e280e13ecf64 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Joseph Gallagher Ltd | £0 | 20 Oct 2020 | active |
description
Under Track Crossing of Utilities
- Nr pipejacks under the GWML and North Depot railway to carry diverted utilities
The UTX will be formed of 8 No. 1.2m internal diameter precast concrete pipes jacked through the ground below the GWML and North Pole (IEP) railway lines. Seven of the bores are to be constructed from a temporary steel sheet piled launch pit located adjacent to OOCL within the decommissioned Hex depot. They will be jacked approximately 175m to a reception pit located within the Wormwood Scrubs common land just south of the boundary to the IEP depot.
The eighth bore, which is nearest to Old Oak Common Lane, is to be driven from reception pit located within Wormwood Scrubs land. This 160m long bore will terminate in a reception pit constructed just north of the out of use Down/Up Wycombe Line, railway embankment and adjacent to Old Oak Common Lane
Commence works on site July 2020 with the construction of launch and reception pits, including site establishment by the sub-contractor. Commence pipe jacking October 2020, complete December 2020. Prior to this works the sub- contractor shall complete detailed planning, SHEQ documentation approval with all parties, temporary works design and approvals, fabrication design and approvals.
The selected Supply Chain Partner must be able to demonstrate:
Thames Water approved contractor Micro boring Specialist Deep Drainage Temporary Works Working in railway environment Dimensional Control
About the buyer's selection process:
Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.
The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.
What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment).
About the buyer:
In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common.
BBVS are committed to delivering this project to align with the key principles of Integrity, Leadership, Respect & Safety.
Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.
The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.
What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: Commercial, Programme, Methodology, HSEQ, Capability and Capacity.
In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=47186101 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/614a8cda-6d29-46c7-b226-64b472b171dd , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 2 Nov 2020 | Award (award) | · | 22f4fe83-e424-45a2-8d1b-1318ea007916-390672 |
more from Balfour Beatty VINCI Systra JV
- WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall (S4) · £20,000,000 · 28 May 2026
- Traffic Management - Old Oak Common (S4) Station · £2,500,000 · 10 Mar 2026
- Fit Out - WP12.10 Statutory and Wayshowing Signage- Old Oak Common (S4) Station · £500,000 · 31 Oct 2025
- WP15 Final Highways Scope - Old Oak Common (S4) Station · £20,000,000 · 21 Aug 2025
- Labour Supply - Old Oak Common (S4) Station · £1,000,000 · 28 Jul 2025
- BBVS & HS2 Station Furniture - HS2 Phase 1 Stations - Old Oak Common (S4) Station · £5,000,000 · 13 May 2025
- WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station · £5,000,000 · 10 Apr 2025
- Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station · £10,000,000 · 7 Feb 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PHB Subway Pumps · United Lincolnshire Teaching Hospitals NHS Trust · £35,835
- EKFB Joint Venture - Micro Tunnelling and associated works · Eiffage Kier Ferrovial BAM JV HS2 Main Civils Works, Lots C2 & C3 · £10,000,000
- Subway Refurbishment - Phase 2 Traffic Management (Contractor) · THE UNIVERSITY OF BIRMINGHAM · £46,308
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.