key details
| Value | £500,000 |
|---|---|
| Status | planned |
| Category (CPV) | 45000000 |
| Contract start | 31 Mar 2021 |
| Contract end | 3 Sept 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-707ad03d-00f9-4410-84ee-dc62037afddc |
description
The Department for Education requires a suitably experienced Contractor to express their interest to tender for the internal room modification and reconfiguration works, as well as M&E services including the replacement of existing boiler pumps at Hackney New School. The project is being procured on a D&B basis.
Hackney New School is a recently built school, located between Kingsland Road and Downham Road, in Hackney, inner northeast of London. The address is 317-319 Kingsland Rd, Dalston, London E8 4DL. The school is comprised of 3 blocks, built approximately 5 years ago and it houses 900 secondary pupils.
The client requires a number of internal alterations, and resolution to a number of mechanical and electrical items. The following key items have been identified as required to be undertaken as part of this scheme:
| 1. | Conversion of existing classrooms to new food tech room and conversion of existing offices to a new resistant materials workshop. (Approx. GIFA - 209m2) |
| 2. | Convert some music practice rooms to offices and enclose the first floor atrium with partially glazed, partially solid walls. (Approx. GIFA - 66m2) |
| 3. | Plant room maintenance works, reconfiguration to the BMS and associated works and replacement of 7 no. boiler pumps. |
The Contractor will be procured on a full design and build basis (inclusive of PCSA agreement) for these works.
The target construction programme runs from 28/07/21 to 31/08/21 during the summer period. The project is scheduled to be handed over to the school in September 2021 for a normal school opening.
The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). The Contractor will be responsible for developing, agreeing and finalising the design following client engagement meetings as well as undertaking the overall construction of the works during the summer holiday period before handover to the school.
Appointment of contractor will be on the basis of the criteria to be published in the tender documents, and the contract will be awarded on the basis of the following split: Qualitative assessment 60% & Quantitative assessment 40%. As part of the Qualitative assessments the Contractor must demonstrate a capability to manage and undertake such work while achieving programme. All eventual tenders must be demonstrated to be under budget as part of the Quantitative assessment, any bids considered over budget will be scored as deficient.
Contractors wishing to receive the tender documentation for this project should respond to Chris Bullough at the email address below.
Additional information: ITT will be issued on 28th Jan 2021 with response due on 17th Feb 2021 (3 weeks). Please ensure all expresses of interest are received in advance of this date.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 13 Jan 2021 | Planning (planning) | · | 01582b7a-acf4-43ec-bbb5-0a269b9cae81-405436 |
more from MACE LIMITED
- Educational Academy-Refurbishment, Alteration and New Build Works · 25 Apr 2024
- Structural Dismantling and Removal Works · £200,000 · 1 Feb 2023
- Ada Lovelace S278 Highway Works · £100,000 · 1 Dec 2022
- LC0210 Morley College Chelsea Centre (MCCC) · £1,800,000 · 29 Nov 2022
- FS0714 Cambridge Maths School (Temps Site refurbishment) · £1,200,000 · 11 Jul 2022
- Cambridge Mathematics School Temporary Accommodation · £1,237,085 · 15 Mar 2022
- FS0171 - Waterside Academy Internal Refit · £520,839 · 19 Nov 2021
- HATO Drainage and Roof Replacement · £2,500,000 · 23 Apr 2021
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Valley Primary School - Partial Roof Replacement · Cumberland Council · £62,775
- CPU 8505 - Construction of a SEND unit at Fernwood Academy School. · Nottingham City Council · £3,064,406
- 25221 - Priorslee Campus - Building M&E Fire Condition Survey - AWARD · Telford and Wrekin Council
- Wokingham Borough Council - EMMBROOK SCHOOL - 6TH FORM · WESTWORKS PROCUREMENT LIMITED · £2,500,000
- C006PC - LCWIP 4 CR East Hill Colchester · Essex County Council · £4,309,571
- PL0085 Dovercourt Public Realm · Essex County Council · £2,394,609
- CWF Lot 1A - Barrow Library Roof · WESTMORLAND AND FURNESS COUNCIL · £340,000
- Construction Framework · MERSEYRAIL ELECTRICS 2002 LIMITED
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.