gvtcx

Automation consultancy service

Aston University Published 21 May 2015 Contracts Finder

key details

Statusactive
Category (CPV) 71314000 +2 more
RegionWest Midlands
Deadline29 May 2015
Contract start2 Jun 2015
Contract end2 Jul 2015
SME suitableYes
OCIDocds-b5fd17-6bd3b6df-adc8-11e6-9901-0019b9f3037b

description

At the EBRI plant, a fluidised bed gasifier (1 MW) is connected to a combined heat and power generator. The capacity of the engine is not enough as to take all the gas from the gasifier, so part of the gas has to be flared.

The engine is a MAN marine diesel engine modified to work in dual mode (liquid and gaseous biofuels). The engine starts in liquid fuel mode and if required the load matching control system opens an isolation valve to start fuelling the engine with gas from the gasifier. A flowmeter measures the gas flowrate being burned in the engine.

Apart from this isolation valve, also a fast acting valve is being installed, to regulate the delivery of fuel gas to the engine, to prevent the engine stall when responding to fluctuations in pressure in the supply line. With the previous configuration, the transition from liquid to gas mode was taking place with delayed air to fuel ratio regulation.

EBRI is seeking to procure provide consultancy service on how to modify the load matching system, the engine control system (ComAp) and the gasifier control system, so that the gasifier can be coupled to the engine.

The job includes liaising with the control engineers for the different subsystems: the load matching system, the engine control system and the gasifier control system. The objective is to get the whole process properly integrated to work as a unified system.

The awarded supplier must have experience on programming and operation of CHP dual fuel engines.

The supplier is expected to first provide technical support to the control engineers of the different subsystems and finally provide further solutions after the first commissioning day.

The outcome of this job is having the CHP engine working on syngas from the gasifier on a smooth and safe way.

Further assistance on the Hazop study that is planned to take place after the first commissioning date may also be offered as an option.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
21 May 2015 Tender (tender) · ocds-b5fd17-6bd3b6df-adc8-11e6-9901-0019b9f3037b-65288-ebri-erdf-itq

more from Aston University

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.