Brundtland Building Tower Block - Space Cooling Project

Craig Pullen Consulting Published 10 May 2021 Contracts Finder

key details

Value£200,000
Statusactive
Category (CPV) 45331000
Deadline28 May 2021
Contract start1 Jul 2021
Contract end31 Aug 2021
Procedureopen
SME suitableYes
OCIDocds-b5fd17-6a2e774a-afef-44a6-8774-f489e06d8766

description

Since the Brundtland Building Tower Block thermal performance upgrades were completed several years ago, overheating of teaching spaces has become a problem. As a result, Bedford College are proceeding with installation of a hydronic cooling system on Levels 1 and 2 of the building.

The cooling system will also provide low carbon background heating during the winter season by means of the reverse cycle air source heat pumps that are being installed as part of this project.

Building efficiency will be further improved by the installation of a control system furnished by Genius Hub as part of this upgrade package.

Tender packs can be obtained from craig@cpconsulting.org.uk

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
10 May 2021 Tender (tender) · 62979db9-c8ee-4fed-95e3-adbd042d0906-435189

more from Craig Pullen Consulting

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.