Langarth Energy Centre - Design, Manufacture and Install architectural gates to substation compound.

Corserv Limited Published 24 Mar 2023 Contracts Finder

key details

Value£20,000
Statusactive
Category (CPV) 71300000 +2 more
Deadline11 Apr 2023
Contract start22 May 2023
Contract end30 Jun 2023
Procedureopen
SME suitableYes
OCIDocds-b5fd17-694cd1c7-4f46-466d-9246-d51bfd3250a2

description

Coserv on behalf of Cormac Solutions Ltd are seeking to appoint a suitable and experienced contractor to Design, Manufacture and Install architectural gates to substation compound. Part of the Langarth Garden Village development.

Requirements :

Double leaf, lockable, gate dimensions 6000mm wide (both leaves) x 4400mm high (approx.), the opening that the gates and posts fit into is 6600mm. Gate to allow for 50mm ground clearance. Finish to be obscure / solid panel in either Corten Steel or colour effect to Corten Steel colour. An "Industrial" looking gate, with a motif laser cut into the panel (see Langarth Garden Village logo below). Posts are to be supported by foundations only and not attached to the pre-cast panel wall. Gates to open outwards, away from the compound. Restraints to be provided for opened gates, drop bolts for closed gates.

Please see enclosed documents for full requirements.

The intention is to award the contract to the most economically advantageous tenderer based on 100% price.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
24 Mar 2023 Tender (tender) · a8db48fa-f113-437a-bda7-2f2ea064c16f-627619

more from Corserv Limited

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.