gvtcx

A63 Brough Junction Improvements

EU SUPPLY LIMITED Published 19 Dec 2022 Contracts Finder

key details

Statusactive
Category (CPV) 45200000
RegionYorkshire and the Humber
Deadline28 Feb 2023
Contract start24 Apr 2023
Contract end24 Feb 2024
Procedureopen
SME suitableYes
OCIDocds-b5fd17-674c8c39-289b-417f-9309-6160febcfc16

description

The proposed scheme replaces the existing 4 way traffic signal at the junction of the Welton Road/Water Lane(A63 slip road link)/Welton Low Road with a 3 way signalised roundabout, with Welton Low Road becoming a priority junction. It includes pedestrian and cycle improvements largely to improve the route to South Hunsley School to and from Brough. The existing junction is elevated and the new roundabout is elevated on an embankment to match the existing levels. The existing junction creates congestion at peak hours with large queues forming mostly from commuter traffic to Hull in the am peak and from Hull in the pm peak, the proposals are expected to reduce this queuing.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
3 Feb 2023 Tender amendment (tenderAmendment) · 17bc7bc5-551e-479e-b441-67a68d055bd8-611733

more from EU SUPPLY LIMITED

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.