gvtcx

CWC23071 Technical Support - Engineering for Energy from Waste Plant Framework

Wolverhampton City Council Published 25 Jan 2024 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Statuscomplete
Category (CPV) 71300000 +1 more
Deadline27 Feb 2024
Contract start1 May 2024
Contract end30 Apr 2028
Procedureopen
SME suitableYes
OCIDocds-b5fd17-6600c223-eb1d-476e-8416-1e295e3ec7ea

Awards (6)

This procurement was awarded to 4 suppliers. Values shown are per-award; the notice total is ·.

SupplierValueDateStatus
Cobalt Energy shared £5,000,000 14 Aug 2024 active
Cobalt Energy shared · · active
Fichtner Consulting Engineers Ltd shared £5,000,000 14 Aug 2024 active
Ficthner Consulting Engineers Ltd shared · · active
Stantec UK Ltd shared £5,000,000 14 Aug 2024 active
Stantec UK Ltd shared · · active

description

The Wolverhampton Energy from Waste (EFW) plant is owned by the council, and came back into council operation in February 2023 following a 25 year Operate & Maintain (O&M) contract operation by a third party contractor.

The plant was refurbished in the 1990's prior to the commencement of the 25 year O&M contract which ceased in February 2023.

Availability of the plant is largely good, although there are on occasion unplanned outages.

As operation and maintenance of EfW plants is highly technical, the council is seeking to develop a call off framework with suppliers who can assist it with specialist technical engineering support and advice as and when required.

The suppliers included on the framework shall have demonstrable experience of providing specialist engineering advice and support on Energy from Waste plants in all areas including :

Mechanical Engineering;

Electrical Engineering;

Civil Engineering and

Environmental Engineering.

The Framework will be essentially a select list of service providers, which will allow for either Direct Awards or Further Competition.

The intention is to appoint a maximum of 3 organisations onto the Framework. If more than 3 competent and experienced organisations submit a bid, then the 3 highest scoring bidders will be placed on the framework.

The Framework Agreement will be in place for 4 Years.

While there is no guarantee of any work coming from being on this framework. The Council have set an overall value of call offs from this Framework which will be up to £5 million.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

4 notices published against this procurement.

PublishedTypeRegimeNotice
25 Jan 2024 Contract notice (F02) Earlier regulations 002538-2024
25 Jan 2024 Tender (tender) · 0034c53b-3703-4ef4-8895-1dc29c38179b-717139
8 Oct 2024 Award (award) · d40ef5a9-78ae-4408-9254-0ad3eea9abb0-791796
19 Nov 2024 Contract award notice (F03) Earlier regulations 037357-2024

more from Wolverhampton City Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.