gvtcx

Portakabin Variation

MCA - Maritime and Coastguard Agency Published 1 Oct 2021 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£88,013
Statuscomplete
Category (CPV) 45000000
RegionSouth East
Deadline7 Sept 2021
Contract start8 Sept 2021
Contract end15 Sept 2021
Procedureselective
SME suitableYes
OCIDocds-b5fd17-659a18f9-f95d-41d4-a3d0-784e9fb57e8b

Award

SupplierValueDateStatus
PORTAKABIN LIMITED £88,013 7 Sept 2021 active

description

Holy Island - Foundations and External Works - as per quote 210818 Surveys, investigations & design - Undertake foundation & drainage designs - Excavation - Strip topsoil for preservation, average depth 300mm. Excavation to reduce levels, average depth 200mm. Supply & lay one layer geotextile membrane. All excavated materials to remain on site. - Foundations & piers - Excavate pits for foundations, 800 x 800 x 600mm deep x 9nr (all excavated materials to be remain on site). Supply & lay concrete to bases, 800 x 800 x 600mm deep x 9nr. Supply & install concrete levelling piers x 9nr. Supply & lay reinforced concrete slab to vehicle parking bay including tamped finished. Optional extra to supply & lay 75mm insulation to slab area £600.00. - Foul drainage - Excavate trench & trim base, lay 110mm DIA uPVC pipe x 15 Lin m. Bed, surround & backfill with type 1 granular fill, average depth 600mm. Supply & install 450mm DIA plastic inspection chamber x 2nr (max 1.0m depth). Supply & install new manhole on existing sewer tail. Test drainage on completion. Note, we have allowed for connection into an existing combined sewer subject to drainage design & Local Authority approval. - Storm drainage - Supply & install access gullies to rain water pipes x 2nr. Note, we have allowed for connection into an existing combined sewer subject to drainage design & Local Authority approval. - Ducts - Excavate trench & lay sand blinding x 15 Lin m, supply & lay 2nr 100mm DIA general purpose ducts each complete with 2nr bends, draw ropes & marker tape. - Water supply - Excavate trench & lay 25mmMDPE water main, lay warning tape & backfill. Alterations & connection to existing water system. Trace heating of above ground water pipework. - Electrical supply - Provisional Sum £4,000.00 for the supply & installation of submain from adjacent public toilets, 25m - Paving & surfacing - Lay & compact Type 1 granular material to pathway, 100mm thick x 30m2. Lay & compact Type 1 granular material to par

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
1 Oct 2021 Award (award) · 8bb9fc7c-a1b3-488a-851b-ae2bc7714a11-473331

more from MCA - Maritime and Coastguard Agency

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.