BBV Sublot 1B Tunnel Grout Treatment
key details
| Value | £2,500,000 |
|---|---|
| Status | active |
| Category (CPV) | 44831400 +1 more |
| Region | North East, West Midlands, London, Yorkshire and the Humber, East Midlands, East of England, North West, South West |
| Deadline | 15 Sept 2025 |
| Contract start | 20 Nov 2026 |
| Contract end | 22 Jan 2027 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-6245c670-8384-40ec-b14c-75042530354f |
description
"Ground Treatment "
The SC (Subcontractor) will assess the findings of the probe hole investigation and will develop the grout treatment strategy to be followed with a scope to minimize any excess water ingress during CP excavation and improve the ground stability.
Grouting operations will include stage permeation grouting on max 1m steps, with the use of packers.
Subcontractor based on ground and ground-water conditions as revealed from ground investigation (probe holes) shall develop the grouting strategy. The strategy will include as a minimum but not exclusively the following:
- A grouting pattern of primary and secondary on the periphery of CP profile
- Drilling diameter, orientation, and lengths of each grouting hole
- Bottom-up grouting stages with the use of packers. The grouting stages should not exceed the length of 1m.
- In case required (unstable ground) Subcontractor may need to make use of a tube a manchette TAM (sleeve pipes) system to perform the grouting. In this case the strategy should be developed accordingly.
- Mix design(s) of the grout injection
- Max Pressure and max Volume criteria for stopping each grouting stage
- Tertiary drilling holes in case primary and secondary do not reach the target criteria.
- As built records grouting locations lengths stages grout consumptions and max pressure. "
Additional information: Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of work, prior to completing this expression of interest (EOI).
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=99370443 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/bdf5d5a4-c383-4335-9366-6542a9c1fea1 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Sept 2025 | Tender (tender) | · | bdf5d5a4-c383-4335-9366-6542a9c1fea1-862469 |
more from Balfour Beatty VINCI JV HS2
- BBV HS2 MWCC North - Architectural Construction Works - Buildings · £5,000,000 · 23 Jun 2026
- BBV Sublot 4 - HSST1020 - Cut & Bent Steel Reinforcement - Curzon Approach Viaducts · £2,500,000 · 13 May 2026
- BBV Sublot 4 - HSST1020 - Deck realignment and jacking operation · £500,000 · 24 Mar 2026
- BBV HS2 MWCC North - Project Wide Noise Barrier Acoustic Doors (Supply Only) · £1,000,000 · 19 Mar 2026
- BBV Sublot 4 - HSST1020 - WWH Hydraulic Ramp reposition · £500,000 · 16 Feb 2026
- BBV HS2 MWCC North - Project Wide Utilities Works · £2,500,000 · 6 Jan 2026
- BBV Delta Junction - HSST1040 Deck Subsurface Drainage · £50,000 · 5 Jan 2026
- BBV HS2 DELTA - Precast Concrete Culvert (Supply only) · £500,000 · 2 Dec 2025
all contracts from this buyer →
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.