SPaTS Framework Lot 1: Services in connection with Acoustic Monitoring and Cable Dehumidification Systems - Severn River Crossing

Highways Agency Published 26 Jan 2018 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£81,467
Statuscomplete
Category (CPV) 71311210
Deadline11 Jan 2018
Contract start12 Jan 2018
Contract end31 Dec 2018
Procedureselective
SME suitableYes
OCIDocds-b5fd17-61e4b534-2a55-43af-8435-003b0455ccac

Award

SupplierValueDateStatus
Ove Arup & Partners £81,467 11 Jan 2018 active

description

The Severn Crossings, including responsibility for their maintenance and toll operation, will return to public ownership on 8 January 2018. Government announced on 21st July 2017 the removal of the tolls at Severn River Crossing by the end of 2018. There is therefore a need to develop an "interim" solution for the ongoing delivery of the services associated with the crossings, ensuring continuity of service to their users

All key supply chain contracts for the toll are currently managed by Severn River Crossing Plc. To ensure continuity of service, Highways England is identifying the key supply chain arrangements, to arrange the continuation of current contracts to Highways England before the end of December 2017.

As part of this portfolio of contracts is the current Acoustic Monitoring and Maintenance Contract currently provided by Mistras Ltd and the associated Project Manager for Acoustic Monitoring currently provided by AECOM; and the main cable and anchorage dehumidification systems for which AECOM currently provides data collection, interpretation and advice. These contract will need to be replaced when the Severn River Crossing move to public ownership in January 2018.

Acoustic Monitoring is used to assess the deterioration rates of the wires within the M48 Severn Bridge main cables. Sensors over the entire length of both main cables provide information on the rate of failure, and location of wire breakages, enabling the programming of maintenance and safety critical controls along the bridge.

The main cable and anchorage dehumidification systems limit the deterioration rates of the wires within the M48 Severn Bridge main cables. Sensors inside the plant rooms, at injection and exhaust sleeves and inside the anchorages provide information on the performance of the systems.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
26 Jan 2018 Award (award) · c595d40d-d54e-4462-b90f-8f0ae5064a34-194052

more from Highways Agency

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.