gvtcx

Second Floor Office Alterations at The Arc

NOE-CPC Published 12 May 2015 Contracts Finder

key details

Statusactive
Category (CPV) 45262700
RegionEast Midlands
Deadline20 May 2015
Contract start14 Jul 2015
Contract end14 Jul 2016
Procedureopen
SME suitableYes
OCIDocds-b5fd17-61d8111a-adc8-11e6-9901-0019b9f3037b

description

As an authority Bolsover District Council (BDC) are undertaking office relocations to maximise the efficiency of its property assets. Part of this will see the relocation of staff from the second floor of BDC’s main council offices, The Arc, to other areas of the building. Once this has been carried out it will allow planned alteration works to the second floor to be carried out.

The majority of the work should be able to be undertaken during normal working hours as the whole of the second floor will be unoccupied with access being provided via one of the stairwells.

The works will consist of new partitions constructed using a Gypframe metal partition system, reconfiguring existing suspended ceilings and installing new, electrical works, joinery work, finishes work including new carpet tiles and painting of walls.

Additional information: https://in-tendhost.co.uk/noecpc/aspx/Home

Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/noecpc/aspx/

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
12 May 2015 Tender (tender) · ocds-b5fd17-61d8111a-adc8-11e6-9901-0019b9f3037b-64317-crh-00735

more from NOE-CPC

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.