gvtcx

Purchase of a Mobile Welfare Unit for Golitha Falls NNR

Natural England Published 17 Sept 2024 Contracts Finder

key details

Value£40,000
Statuscomplete
Category (CPV) 34114300
Deadline7 Oct 2024
Contract start8 Oct 2024
Contract end28 Feb 2025
Procedureopen
SME suitableYes
OCIDocds-b5fd17-6136549e-f7a9-4888-93d3-cb80ea46f5b2

Award

SupplierValueDateStatus
GENQUIP LIMITED £26,820 6 Oct 2024 active

description

We are the East Cornwall NNRs Team of Natural England, who manage Goss Moor and Golitha Falls National Nature Reserves in Cornwall. We are seeking a Ground Hog GP360 Eco Fusion Pulse 12ft mobile welfare unit with the following specs & extras: specs & extras:

Road legal
Two years warranty
Length 3655 mmLength (including drawbar) 4920 mm
Height (on wheels) 2.9 m
Height (on ground) 2.5 m
Generator 6 kVA
Unladen Weight 1750 kg
Possible Gross Weight 1800 kg*
Solar Panel 360 Watt
Fresh Water 20 Litres
Waste Water 20 Litres
Toilet Tank Size 280 Litres
Fuel Tank Size 58 Litres
Canteen area with table and bench seating for up to 6 people
12V LED lighting with PIR
12V diesel powered air blown heating system
Warm water supplied by a 230V on-board heating system
Large stainless steel sink c/w warm water tap
Single inverter powered socket & USB connection
Generator start panel c/w hour run meter
Fresh & waste water containers (20 Ltr cap each)
Consumer board c/w RCD & MCBs Carbon monoxide monitor and smoke alarm
130Amp hour battery/ charger & battery guard
Toilet area with plastic recirculating toilet
12V LED lighting with PIR in toilet area
Forearm wash basin with c/w warm water tap in toilet area
Warm water supplied by a 230V on-board heating system
Generator/ Warm Room
12V LED lighting with PIR in generator/ warm room
12V diesel powered air blown heating system in generator/ warm room
Access to fuel tank with separate fuel level in generator/ warm room
gauge (58 Ltr cap) in generator/ warm room
Fuel Active system in generator/ warm room
Generator start battery in generator/ warm room
Fuel tank runtime = approx. 25 hours in generator/ warm room
Spare wheel and tyre
Corporate branding and colour scheme
Safety pack

We would like the unit delivered to the Lower Penrose Veor Farm, St Dennis, St Austell, Cornwall, PL26 8DB.

Additional information: To apply for this opportunity you must submit your quotation meeting the requirements detailed in the Request for Quotation (RFQ) attached.

Your response must be sent to toby.cogan@naturalengland.org.uk by 12 midday on 07/10/2024.

If you have any clarification questions linked to this opportunity or the procurement process please submit these via email to toby.cogan@naturalengland.org.uk. Please note that, unless commercially sensitive, both the question and the response will be circulated to all tenderers.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
17 Sept 2024 Tender amendment (tenderAmendment) · 15eb38e1-f381-4221-b29b-9e4e71097874-786002
22 Nov 2024 Award (award) · 43b9f40d-8d84-4708-bc10-93a77f662a78-804879

more from Natural England

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.