key details

Value£1
Statuscomplete
Category (CPV) 44114000 +2 more
RegionLondon
Deadline15 May 2020
Contract start28 May 2020
Contract end30 Sept 2020
Procedureopen
SME suitableNo
OCIDocds-b5fd17-607c775e-64b4-4664-a867-3bbd08a04b66

Award

SupplierValueDateStatus
not named £1 27 May 2020 active

description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The Project comprises:

  • a.tunnels:
  • i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
  • ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
  • b.Worksites:
  • i.five main tunnel Worksites (drive and/or reception sites)
  • ii.16 CSO Worksites
  • iii.two System modification Worksites Thames Tideway Tunnel
  • iv.works at Beckton Sewage Treatment works.

Section 4: Scope of Works

Construction of a secondary lining to a 30m dropshaft, casting of the vortex drop tube, and internal walls at Acton Storm Tanks. The site is situated in Ealing, West London. These works are to run concurrently with other BMB areas of works including hydraulic structures works. Full welfare facilities will be provided to all subcontractors.

The scope of works includes supply of concrete and provisions of which to carry out the secondary lining. This will require consideration for sequencing alongside the site wide programme. The slipforming operation will be given priority for logistics and laydown areas during this time.

The subcontractor will have to take into consideration ducting (condensation drainage and ventilation ducting) that enters the shaft is required, including but not limited to waterproofing detail and casting in.

The Subcontractor shall be responsible for design and supply of any temporary works slipform shutter required for construction of the secondary lining of the shaft, baffle walls and casting in the vortex drop tube structure.

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on;

Cost

Timeliness of return

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted dir

Additional information: Acton Storm Tanks

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
8 Jan 2021 Award (award) · a9f18b12-7a94-4702-9b48-79d640bf4075-404419

more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.