CBC-1122-T-CE 3G Artificial Pitch Installation
key details
| Status | active |
|---|---|
| Category (CPV) | 45212100 +1 more |
| Deadline | 18 May 2020 |
| Contract start | 6 Jul 2020 |
| Contract end | 12 Oct 2020 |
| Procedure | open |
| SME suitable | No |
| OCID | ocds-b5fd17-6028e6e0-6176-4a5b-81d5-e08f83e0c83f |
description
Background Information - In partnership with Central Bedfordshire Council and the Football Foundation, Dunstable Town Council opened the all new Creasey Park Community Football Centre in 2011. The centre has a stakeholder group that comprises the local authority (CBC) as owners of the facility, Dunstable Town Council as the centre managers, Dunstable Town Football Club, AFC Dunstable and the local county FA (Beds FA). Creasey Park is home to two local football clubs Dunstable Town FC and AFC Dunstable. Dunstable Town FC.
Our main objective is to have a high-quality playing surface that fully meets the needs of our operator, Dunstable Town Council, and all existing customers/users and stakeholders, and to attract more customers/users to our facility. Also, that the surface and associated installation meets all the required standards (as detailed in the specification and tender documentation); is robust and hard-wearing; easy to maintain; fit for high usage and longevity; limits/mitigates the revenue impact/operational costs as much as possible; and also mitigates the overall environmental/health impact (e.g. rubber crumb) on the surrounding area (e.g. Greenbelt) and to all users and staff.
We realise that due to the impact of Covid-19, including the enforced social distancing restrictions and lockdown, these could negatively impact on the timescales listed, as it will depended on the availability of the workforce; and the required materials via the supply chain being readily available in the required quantities; and Government advice and any restrictions in place. Also, these works are detailed in a submitted Planning Application (27th March 2020) and therefore, we will need to receive Planning approval before this installation can commence.
Please see the specification and associated appendices, which detail the type/quality and quantity of products/materials etc. required in order to complete the installation of the 3G ATP.
Help and Support - The Council will provide as much support and information as it can in order to help guide you through the Tender process. Questions asked together with the Council's response will be made available to all tenderers to ensure a fair and consistent approach to all. If there is anything you are not sure of or need clarification on, please contact us using the Correspondence facility on the In-Tend portal. Last date for receiving questions on Intend system: 12:00 Noon 11th May 2020
Return of Tender - Completed Tenders and attachments should be submitted electronically, by the due date via our "In-Tend" electronic tendering system. Tenders must be uploaded via the "My Return" section of the system. Tenders submitted through the correspondence facility will not be considered.
Your Tender must be submitted via the In-Tend system by no later than 12:00 noon on the 18th May 2020. Tenders received after that time will be excluded.
...
Additional information:
To express an interest, please log in or register on our electronic tendering system https://in-tendhost.co.uk/centralbedfordshire in order to view the necessary tendering documents and respond accordingly.
Please note that once you have registered on In-tend a separate action (expressing an Interest) is required to access the documents, you must click on the actual Tender you wish to access. We accept no liability if you have not expressed an interest in the tender.
Is a Recurrent Procurement Type? : No
documents
- https://in-tendhost.co.uk/centralbedfordshire/aspx/ , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/54b74b5d-2423-4c05-91a7-b72eab704aec , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 27 Apr 2020 | Tender (tender) | · | 54b74b5d-2423-4c05-91a7-b72eab704aec-355881 |
more from Central Bedfordshire Council
- CBC-1960-EXF-FC-SK - Occupational Health Service - AWARD · 27 Jul 2026
- CBC-1984-EXF-DA-ZH Electronic Care Monitoring System - AWARD · 26 Jun 2026
- CBC-1917-Q-SM Water Risk Assessments - AWARD · 23 Jun 2026
- CBC-1916-Q-SM Fire Risk Assessment Programme - AWARD · 23 Jun 2026
- CBC-1934-Q-DS Shefford Riverside Path Works 2026 - AWARD · 15 Jun 2026
- CBC-1929-T-LS Rough Sleeper Outreach Service - AWARD · 11 Jun 2026
- CBC-1951-T-TS Housing Service Waste Management & Moving Services - AWARD · 2 Jun 2026
- CBC-1795-T-TS Domestic and Communal Electrical Installation - AWARD · 20 May 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Climbing Tower with Integrated High Ropes Course At Castleshaw Centre, Delph, Oldham · Oldham Metropolitan Borough Council · £120,000
- Thornaby Swimming Pool New Leisure Building and Pavilion Remodelling · Stockton on Tees Borough Council
- ESPH599 SB WDC Knights Farm Sports Hub Construction · Wealden District Council · £9,812,151
- Construction of Multi-Use Amenity Hub and Sports Facility(The Hive) · LONDON GATEWAY PORT LIMITED · £2,500,000
- Construction of a Skate Park Facility at Britannia Park - AWARD · Sandwell Metropolitan Borough Council
- Leisure Centre PSCA RIBA 4 via SCAPE Construction Framework · Stevenage Borough Council · £1,510,153
- Britton's Football Hub Development · London Borough of Havering
- PSDS Works at Windsor Leisure Centre · The Royal Borough of Windsor and Maidenhead Council · £6,301,900
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.