Exhibition stand design and build - Energy Innovation Summit 23

KNOWLEDGE TRANSFER NETWORK LIMITED Published 3 Aug 2023 Contracts Finder

key details

Value£90,000
Statusactive
Category (CPV) 39154100
RegionNorth West
Deadline4 Sept 2023
Contract start11 Sept 2023
Contract end30 Nov 2023
Procedurelimited
SME suitableYes
OCIDocds-b5fd17-09df3120-aaed-444c-afdd-a0e78e2e10f0

description

Innovate UK KTN connects innovators with new partners and opportunities beyond their existing thinking - accelerating ambitious ideas into real-world solutions.

We want to appoint a suitably qualified exhibition design company to design, manufacture, instal and derig an exhibition stand for the Energy Innovation Summit. We will work closely with the chosen company to develop and realise the stand in a creative and impactful way that is relevant and accessible to our audiences.

Innovate UK is organising a cross-government stand at the Energy Innovation Summit at the Exhibition Centre, Liverpool, 31 October - 1 November 2023. Innovate UK KTN will be leading on the design and build and management of the stand.

The 150m2 stand is shown at K3 on the attached floor plan. The final representatives on the stand will be finalised during the coming weeks.

This will be an opportunity for significant brand positioning and awareness for Innovate UK and display of its brand must be a primary consideration.

Objectives

Inspire - connect with the audience
Create a stand that is engaging and showcases the impact innovation has on the UK economy and the energy sector
Provide a showcase for Innovate UK and partners
Put the UK government at the heart of the UK's energy innovation landscape

The stand should meet the objectives outlined above, appeal to the specific target audiences and meet our requirements for brand visibility and accessibility. Exhibition space to include:

Area to showcase physical demos
Up to 3 individual semi-private meeting pods
Networking area
Speaker area and associated A/V
On-stand displays of digital content
Limited on-stand storage
Production of impactful graphics

Build

Following sign-off of detailed designs, the successful agency will undertake production design and specification of all exhibition elements. They will need to ensure the build is durable and is easy to clean. The structures must be compliant with relevant statutory and non-statutory requirements e.g. Health & Safety regulations, Equality Act legislation, be constructed of fire retardant materials and follow best practice procedures. We would like to see the use of sustainable, reusable materials wherever possible.

Budget

Please break down the costings to include the design, production, transport, build and derig within a £70k + VAT ceiling.

£20k + VAT should be ring-fenced for in-event costs.

Outputs

All rights (including ownership and copyright) will pass to Innovate UK KTN on completion of this project.

Exclusions:

  • Content management

Please apply by 4 September to victoria.parsons@iuk.ktn-uk.org with a proposal with your company details, experience of similar sized design and build contracts, confirmation of availability for the project, suggestions of materials to ensure we adhere to Net Zero best practice, a budget and a timeline.

Submissions will be assessed on an ongoing basis until this date.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
3 Aug 2023 Tender (tender) · 05582394-86af-4347-b20a-768b75937c70-668321

more from KNOWLEDGE TRANSFER NETWORK LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.