Fit Out - WP12.5 Architectural Metalwork - Old Oak Common (S4) Station
key details
| Value | £10,000,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45262420 +7 more |
| Region | London |
| Deadline | 30 Aug 2023 |
| Contract start | 27 May 2025 |
| Contract end | 31 Jul 2029 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-5fd91183-4ec6-4fd6-b9f4-85cb2cfbaeff |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| not named | £0 | 30 Apr 2025 | active |
description
WP12.5 Architectural Metalwork
Scope of work:
OOC HS2 Station Architectural Metalwork Package (WP12.5) consists of the design for construction and manufacture, supply, installation and assurance of architectural metalwork to the front of house HS2 Station areas, the Great Western Main Line/ Conventional Station (GWML) and Shared Accommodation Building (SAB). The scope of this package includes the following key elements:
| • | Steel and glazed balustrades, with integrated lighting. |
| • | Timber handrails, with integrated lighting. |
| • | Platform barriers. |
| • | Lighting columns and armatures. |
Key deliverables will be:
| • | Design Development: Prepare the design for construction and manufacture of architectural metalwork, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necessary interface and connection details, structural elements and ancillary elements to meet the prescribed performance requirements. |
| • | Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards. |
| • | Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for the installation of architectural metalwork in accordance with the approved design. |
| • | Assurance and Certification: Generate and supply comprehensive assurance documentation for architectural metalwork installations, including testing as required. |
| • | Coordination: Ensure coordination of architectural metalwork installations with various substrates, and other finishes to achieve integration within the overall project. |
By executing the works diligently and adhering to the prescribed specifications, our aim is to deliver a high-quality architectural metalwork package that meets the requirements and contributes to the success of the Old Oak Common HS2 Station project.
About the buyer's selection process:
Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.
The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.
What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment).
About the buyer:
In 2018, Balfour Beatty, VINCI and SYSTRA (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common.
BBVS are committed to delivering this project to align with the key principles of Integrity, Leadership, Respect & Safety.
Additional information: No Documentation is included at this point.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=72902030 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/86e3db69-ce66-4934-b7d5-bcb0225e144f , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 2 Aug 2023 | Tender (tender) | · | 86e3db69-ce66-4934-b7d5-bcb0225e144f-668586 |
| 1 May 2025 | Award (award) | · | 46cc8f56-d024-4d91-9f80-01132ad716e2-843197 |
more from Balfour Beatty VINCI Systra JV
- WP15.03 Old Oak Common Lane (OOCL) - Highways (incl. Utilities) & IEP Depot Temp. / Permanent Road & Retaining Wall (S4) · £20,000,000 · 28 May 2026
- Traffic Management - Old Oak Common (S4) Station · £2,500,000 · 10 Mar 2026
- Fit Out - WP12.10 Statutory and Wayshowing Signage- Old Oak Common (S4) Station · £500,000 · 31 Oct 2025
- WP15 Final Highways Scope - Old Oak Common (S4) Station · £20,000,000 · 21 Aug 2025
- Labour Supply - Old Oak Common (S4) Station · £1,000,000 · 28 Jul 2025
- BBVS & HS2 Station Furniture - HS2 Phase 1 Stations - Old Oak Common (S4) Station · £5,000,000 · 13 May 2025
- WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station · £5,000,000 · 10 Apr 2025
- Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station · £10,000,000 · 7 Feb 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Fit Out - WP12.2.2 - WP12.2.2 Accommodation Blocks, LEER, and Central Core Structural Steelwork - Old Oak Common (S4) Station · Balfour Beatty VINCI Systra JV · £2,500,000
- 40068422 - Air Blast Tunnel Repair · Ministry of Defence · £172,272
- MTC/013608 · NOTTINGHAM TRENT UNIVERSITY · £246,671
- MTC/013328 · NOTTINGHAM TRENT UNIVERSITY · £317,363
- CONSTRUCTION OF TRAINING AT HEIGHT FACILITIES LOCATED AT LOT 1 - SUTTON COLDFIELD COMMUNITY FIRE STATION AND LOT 2 - CANLEY FIRE STATION · West Midlands Fire Service · £375,566
- Supply of Steel Beams (Universal Column) · Environment Agency
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.