gvtcx

St Helens Chamber - Boiler and Radiator Replacement, Starting Point

ST HELENS CHAMBER LIMITED Published 17 Nov 2017 Contracts Finder

key details

Value£30,000
Statusactive
Category (CPV) 39715000
RegionNorth West
Deadline8 Dec 2017
Contract start15 Jan 2018
Contract end19 Feb 2018
SME suitableYes
OCIDocds-b5fd17-5f836370-c469-47dd-a39e-bf78c6bdaef6

description

Specification and Scope - see full ITT for all information

St Helens Chamber requires a contractor to undertake Boiler and Radiator Replacement where necessary at the following address:

Starting Point

  1. - 6 Hardshaw Street St Helens WA10 1RE

The building is in a Conservation Area. The Flue if required will have to be located at the back of the building and must be in accordance with St Helens Council Conservation Officer's guidelines.

The main reason for the replacement of the Boiler and Radiators is to increase the Energy Efficiency of the building and Energy Rating. Therefore we will expect the system to comply with current Performance/Energy Standards. The building is also being re-designed internally as a Digital Training Centre with a very modern feel and style and so the proposed radiators to be supplied should complement this environment.

Current Radiators of various sizes:

Basement - 7 modern type radiators

Ground Floor - 12 modern type radiators

First floor - 7 modern type radiators & 4 Victorian radiators Second floor - 7 modern type radiators & 7 Victorian radiators

The Chamber will be appointing a CDM. The successful contractor/s will be expected to work with them.

Our chosen provider must be able to provide all services listed.

  1. To replace current boiler and radiators as necessary and all other items associated with a quality heating system.
  1. Ensure that all waste materials are disposed of correctly.
  1. Starting Point is located in a Pedestrian Area so vehicle access is limited. Arrangements will need to be made with St Helens Council and parking permits paid for.
  1. Provide and erect scaffold in line with The Work at Height Regulations 2005 if required for the placement of the Flue. It may be possible to use existing scaffolding being provided for other aspects of the refurbishment.
  1. Ensure that Installation is completed by someone that is Gas Safe Registered.
  1. Ensure that any Electrical work is completed by a NICEIC registered electrician.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
17 Nov 2017 Tender (tender) · 7c6d75c7-893d-404f-98aa-038f5be5f4df-182683

more from ST HELENS CHAMBER LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.