Replacement of Communal Boilers - Mandela Court, Heathfield Rise & Oakwood Road
key details
| Value | £400,000 |
|---|---|
| Status | active |
| Category (CPV) | 45453000 +2 more |
| Region | London |
| Deadline | 22 Nov 2016 |
| Contract start | 1 Feb 2017 |
| Contract end | 14 Mar 2017 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-5dccf261-adca-11e6-9901-0019b9f3037b |
description
The London Borough of Hillingdon (Hillingdon) is running a tender competition for an agreement (the Contract) to provide the replacement of communal boilers at Mandela Court, Heathfield Rise and Oakwood Road (the Works) The objective of this project is to engage with a competent contractor to replace the existing boilers with new boiler systems for the purpose of providing reliable heating and hot water services to residents. In line with the LB of Hillingdon design brief, the project when complete will provide residents with efficient and reliable heating and hot water services to the blocks and dwellings, provide cleaner and quieter boiler operation on the estate and increase tenants’ satisfaction with their homes (the Project).
The London Borough of Hillingdon (LBH) intends to replace the boilers and control system at:
Mandela Court (1-30), Biko Close Cowley UB8 2LE - Mandela Court is a Sheltered Accommodation scheme comprising of 30 one-bedroom flats within the main building each with hallway, kitchen and showers. The shared facilities include; laundry, two lounges and kitchen. The heating plant room is located on the ground floor to the side of the building. Access to the plant room is via a double set of louvered doors.
Heathfield Rise (3 -39), Ruislip HA4 7NF - Heathfield Rise is a General Needs Housing scheme comprising of 36 dwellings spread across two blocks. The heating plant room is located in a purpose built building between the two blocks of houses.
Oakwood Road (9 - 39 ODD), Pinner HA5 3UD - Oakford Road Rise is a General Needs Housing scheme comprising of 20 houses spread across two blocks with an external brick-wall plant room. The heating plant room is located between the two blocks of houses.
The Works - The works shall include all of the works described within the specification documents (Part 1 & 2). This specification shall be read in conjunction with the Employers Requirements, schedules, supplementary documents and any drawing issued which defines the requirements of the proposed works to enable the Contractor to prepare and submit a proposal for the Works and undertake construction and completion of the works.
documents
- http://capitalesourcing.com , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/6f9068d0-ff72-4334-9f3b-9b345433edb8 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Nov 2016 | Tender (tender) | · | 6f9068d0-ff72-4334-9f3b-9b345433edb8-113737 |
more from LONDON BOROUGH OF HILLINGDON
- Consultancy Services for Grays Road · £180,000 · 15 Jun 2026
- Supply and Installation of Furniture and White Goods · £3,424,540 · 21 May 2026
- LBH1089 - Souithbourne Gardens - Remedial & underpinning Works · £36,000 · 2 Feb 2026
- Green Home Initiative - Saltash - Phase 8 · £499,066 · 19 Jan 2026
- Green Home Initiative - Saltash - Phase 7 · £465,557 · 19 Jan 2026
- Green Home Initiative - Saltash - Phase 6 · £459,327 · 19 Jan 2026
- Green Home Initiative - Saltash - Phase 5 · £475,401 · 19 Jan 2026
- Green Home Initiative - Saltash - Phase 4 · £468,151 · 16 Jan 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- SYP - Pioneer Close Phase 2 refurbishment · South Yorkshire Mayoral Combined Authority
- Minor Works Framework · Gentoo Group · £19,620,611
- Planned Programme Works · Albyn Housing Society Limited
- Ceiling Mounted Utilisation Sensors · South London and Maudsley NHS Foundation Trust · £240,000
- SYP - Rotherham Main Street Refurbishment · South Yorkshire Mayoral Combined Authority
- CA16715 - C0 Toilet Refurbishment for Northampton College · Crescent Purchasing Consortium Consultancy Ltd
- Academy - Phase 2 Structural Works · The City of Liverpool College · £350,000
- Refurbishment - Electrical Workshops · The City of Liverpool College · £400,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.