gvtcx

Grid Emulation System

Offshore Renewable Energy Catapult Published 27 Mar 2023 Contracts Finder

key details

Statuscomplete
Category (CPV) 31000000
RegionNorth East
Deadline19 Jan 2023
Procedureopen
OCIDocds-h6vhtk-038b35

Awards (3)

This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is ·.

SupplierValueDateStatus
Egston Power Electronics GmbH £2,015,684 21 Mar 2023 active
Egston Power Electronics GmbH · · active
GE Energy Power Conversion UK Ltd £3,915,800 29 Mar 2017 active

description

ORE Catapult is looking to procure a Grid Emulation System to be used in the soon to be developed Technology Demonstration Centre (TDC). This new centre will house a wind tunnel, tribology laboratory, 1MW drivetrain test rig and the new Grid Emulation System. The main purpose of the new Grid Emulation System is to provide a flexible test facility for customers to validate designs or simulation models of their device(s) or control systems

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

5 notices published against this procurement.

PublishedTypeRegimeNotice
7 Apr 2017 Award (award) · 7d2a0648-4e00-4910-b8ed-24cbc76b412e-140556
6 Dec 2022 Contract notice (F02) Earlier regulations 034554-2022
16 Jan 2023 Corrigendum (F14) Earlier regulations 001230-2023
27 Mar 2023 Contract award notice (F03) Earlier regulations 008847-2023
27 Mar 2023 Award (award) · b96eaee3-fcbe-4ebf-bfd1-80a64602c9ac-628439

more from Offshore Renewable Energy Catapult

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.