key details
| Value | £3,200,000 |
|---|---|
| Status | complete |
| Category (CPV) | 09300000 +2 more |
| Deadline | 10 Dec 2018 |
| Contract start | 11 Jan 2019 |
| Contract end | 31 Mar 2021 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-63aa5bff-46c2-411b-9ba7-26f085db5ac7 |
Awards (7)
This procurement was awarded to 5 suppliers. Values shown are per-award; the notice total is £3,200,000.
| Supplier | Value | Date | Status |
|---|---|---|---|
| DuckDuck Ltd, Gemserve Ltd, GenGame Ltd, Green Energy UK PLC shared | £49,125 | 4 Jan 2019 | active |
| EDF Energy R&D, Itron, Nuvve and SMETS Design Limited shared | £1,448,820 | 31 Mar 2019 | active |
| EDF Energy R&D, Itron, Nuvve and SMETS Design Limited shared | £49,888 | 4 Jan 2019 | active |
| EDMI Europe Limited shared | £1,223,768 | 31 Mar 2019 | active |
| EDMI Europe Limited shared | £47,250 | 4 Jan 2019 | active |
| Octopus Energy Ltd shared | £50,000 | 4 Jan 2019 | active |
| Utilisoft Ltd shared | £50,000 | 4 Jan 2019 | active |
description
This is a two stage SBRI. In Phase 1, BEIS will fund up to 5 feasibility studies to scope the design and trial of a smart meter load control device, including giving detail on what functionality will be tested and in what context. Phase 2 will involve selecting and contracting with up to 2 of the above studies/consortia who will each design, build, test, commercially product assure (CPA) and trial the devices, at a scale of around 100 homes, based on existing HCALCS specifications as described above.
HCALCS are specified in Smart Energy Code (SMETS - Schedule 9) and there is existing functionality built into Data Communications Company (DCC) systems to support these devices, but to date no such devices have been manufactured at scale and used. BEIS is procuring the design, build and trial these first of the kind devices, to demonstrate load control using smart meter communications infrastructure to manage domestic electricity loads such as EVs.
Consortiums applying for this SBRI must include an Electricity Supplier & a Meter and/or Charge Point Manufacturer, but could also include a DNO and other parties, such as EV manufacturers and aggregators.
Procurement will be split into two main stages:
Phase 1:
Feasibility
Up to 5 contracts will be awarded to develop a feasibility study which will include device and trial designs, setting out what functionality will be tested, and which partners will be involved and their respective roles. After the feasibility stage there will be a gateway based on evaluation of feasibility studies, resulting in up to 2 contracts being awarded for full design build and trial.
Phase 2:
Full device design, build and test
Involves design, build, testing and pursuance of Commercial Product Assurance of the device by up to 2 consortia. The design and build will include development of "works like, looks like" prototype device and manufacture to scale of ~100 devices, and test will include end to end testing of device functionality and supporting business process.
Trial
Design trial, install devices, manage trial in homes, device removal, trial analysis and write up. Trial should primarily test the ability of smart meter comms infrastructure and connected device to manage/ moderate load of a domestic device, such as an electric vehicle, in response to signals sent by the electricity supplier, but could test other functionalities as proposed by the selected bidder.
The project will produce a 'specification scoping document' at the end of the trial, which will establish any missing use cases identified through the trial and provide a basis for development of a full new device specification by BEIS, with a view to this being adopted into the SEC. This component will be led by a third party that are currently being contracted by BEIS but bidders will be expected to engage in the process to develop it.
This contract is expected to run from January 2019 to March 2021. Overall budget: up to ~£3.25M in total.
Additional information: Each attachment must be no larger than 5MB. The following attachments are included with this Notice:
Invitation to Tender (ITT)
BEIS Terms and Conditions (T&Cs)
Questions and answers from the stakeholder engagement process.
For reference 20181101 Innovation Project Pre-procurement Stakeholder Event
Q and A responses on the ITT - published 26/11/2018
If you wish to take part in this procurement, please see the Tender documents attached to this Notice and send your completed Proposal to Ms Mili Malic at email address stipulated in the "Who to Contact" section.
Any late submissions will not be considered. BEIS reserves the right to halt the procurement process and to not award a contract. BEIS will not be held liable for recovery of costs from unsuccessful bids if a contract is not awarded. All costs will be borne by the bidding organisations. If a contract is created it will be upon BEIS Standard Terms and Conditions or the Short Form Terms and Conditions, which are available on Contracts Finder with this notice. Completed tender submission must be returned by email to: smartmeterspmo@beis.gov.uk by 10 December 2018. After reviewing and evaluating the written proposals, BEIS may decide to conduct bid clarification with suppliers. If successful and upon contract signature, the suppliers may be expected to attend a kick-off meeting taking place mid-January. Project completion is required by 31 March 2021, with a deadline for phase 1 completion on 15 March 2019.
documents
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/005270e2-653d-41ec-b46b-9a1d80898ae2 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/2ddc2ed2-5ade-4ab0-9f10-94ab2f59ea74 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/3e3c2a46-e8d4-4202-ad0f-c4c7a79aacca , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/88e5ef55-1b58-47c9-a965-5bd8e3d1465b , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/fa768ed5-043c-44e9-a53a-7aaed28ebf3d , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/d7b9c187-6383-4833-a540-f3adb5544eee , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Mar 2019 | Award (award) | · | 5a6f6d7b-c0d7-407a-80cd-de4e78140fc0-271439 |
| 17 May 2019 | Award (award) | · | 660deac5-9837-4fd9-bfb1-fca43822b7f3-290129 |
more from Business Energy and Industrial Strategy
- Delivery Partner 2 (DP2) - WH:SHF and WH:LG · 11 Sept 2025
- Heat Network Efficiency Scheme - HNES MAIN · £2,961,208 · 5 Nov 2024
- Re-procurement of Hydrogen Legal Advisors · 1 May 2024
- Technical Assistance Facility 2 - Pre-Tender Market Engagement · 14 Aug 2023
- APGB Reprocurement - Suppliers Event · 6 Jul 2023
- Medicines Manufacturing Skills and Training Consultation · 21 Apr 2023
- Sizewell C Legal Services Contract · £7,500,000 · 31 Mar 2023
- Local Authority 'Capability' and 'Capacity' Building Grant Funding Pilot Evaluation · 9 Feb 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PfH - Responsive Repairs, Disrepair Works and Void Services · Procurement for Housing · £725,000,000
- Supply of Metered Electricity · NORTHERN IRELAND WATER LIMITED · £534,000,000
- Provision of Air Source Heat Pump Systems and Solar Photovoltaic Arrays for Four Children and Family Hubs in Leicestershire · Leicestershire County Council · £98,507
- Utility provider Electricity · mhs homes group · £955,868
- Heating Replacement Works - Phase 2 · SHARE MULTI ACADEMY TRUST
- Installation of Air Source Heat Pump System at Fleetdown Community Centre, Dartford · Dartford Borough Council
- The Flexible Procurement and Supply of Half Hourly Electricity · ASSOCIATED BRITISH PORTS · £185,000,000
- The Keys Academy Trust – Fixed Electricity & Gas Supply Products - Contract Award · The Keys Academy Trust · £253,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.