gvtcx

RWM - 001 - Environmental Assessments to Support Marine Licence Applications

CTM Portal for the NDA Shared Services Alliance Published 26 Apr 2022 Contracts Finder

key details

Statuscomplete
Category (CPV) 90713000
Deadline30 Apr 2021
Contract start6 Aug 2021
Contract end31 Jul 2023
SME suitableYes
OCIDocds-b5fd17-095b866d-6171-451a-85f1-52b19b24e683

Award

SupplierValueDateStatus
AECOM Limited £225,000 30 Jul 2021 active

description

The Consultant is required to undertake desk based underwater noise modelling and assessments to identify if there could be any environmental impacts associated with areas where marine seismic surveys will be undertaken (e.g. impacts such as physiological or behavioural effects on local marine ecology such as fish, marine mammals and birds). The assessments are to focus primarily on designated habitats and protected species at the individual level although implications at community and ecosystem level should also be considered. Assessments should also include wider environmental considerations and ecosystem services if and where appropriate. All assessments should be backed up by evidence and peer reviewed literature to support the conclusions. It is anticipated that the seismic surveys are to be undertaken in up to four inshore areas in English waters during 2022, using standard seismic surveying techniques, and could require four to seven marine licences (this is based on the potential for 2D and 3D surveys being required at three of the inshore areas using different vessels at different times). All licence applications will have to include environmental evidence needed to address regulator requirements and the relevant marine plans to help ensure successful licence applications in line with relevant marine plans. The consultant may also be required to provide ad hoc environmental advice during the marine licence process itself and also to provide support during 2022 when the seismic surveys take place. Additionally aerial surveys may be required in 2022 to support the seismic surveys. Based on regulator advice so far and the activities being proposed, our working assumption is that Environment Impact Assessments will not be required to support the marine licence applications.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
26 Apr 2022 Award (award) · 1730cb20-09ed-4e50-9ebb-c5d99168c09e-532129

more from CTM Portal for the NDA Shared Services Alliance

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.