Oldfield Road - MEP Works
key details
| Value | £500,000 |
|---|---|
| Status | active |
| Category (CPV) | 34632300 +3 more |
| Region | North West |
| Deadline | 28 Oct 2025 |
| Contract start | 17 Jan 2026 |
| Contract end | 18 Sept 2026 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-5b249811-ac4f-4d00-ace8-c380edd5d302 |
description
This is an enhancement scheme funded by the DfT and is part of a package of proposed measures in the Manchester area that are planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study.
The scheme is for the design and delivery of an East facing turnback, located on the Manchester, Bolton and Bury Line (ELR: MVE1) adjacent to the existing Salford Hope Street (Cemex) sidings between Salford Central Station and the Oldfield Road Bridge.
At Victoria Station, the through platforms also accommodate terminating trains. The extended time to terminate and turnback in the platforms restricts platform availability for through services. The provision of the turnback siding will allow terminating services from the East arriving at Victoria to clear the platform, travel to the turnback siding and await their next turn of duty, clear of the station.
There is the further benefit of an additional stop at Salford Central Station for passengers to disembark for Manchester Spinningfields, a major employment location in the city centre. The turnback would also act as a service recovery measure during times of service perturbation.
The turnback is to consist of two roads, to accommodate trains up to 8 car x 24m in one road and 6 car x 24m in a second road; with access to and from platforms 3-6 at Manchester Victoria via existing connections. The new east facing turnback shall also be able to operate as a berthing/storage siding, with walking routes to allow train crew to access and egress the railway. The turnback will be fully electrified at 25kV and be fully signalled as a route for planned, rather than simply emergency, usage.
Scope includes but not limited to:
Installation of Mains Distribution/Lighting control cubicle Installation of Submains Installation of finals circuits Installation of Lighting bollards Installation of Earthing and Bonding Fuse upgrades within DNO Testing and commissioning Inspection and Test Plan Ellipse updates
O&M Manual
Red line Drawings
documents
- https://www.contractsfinder.service.gov.uk/Notice/be72dfea-c4ed-4f8d-ae10-06fde465b877 , tenderNotice
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=101516673 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 22 Oct 2025 | Tender (tender) | · | be72dfea-c4ed-4f8d-ae10-06fde465b877-869106 |
more from Kier Transportation
- Salford Crescent - Early Contractor Engagement for works Landscaping · 19 Mar 2025
- Salford Crescent - Accommodation Block · £25,000 · 21 Feb 2025
- Salford Crescent - Terracotta Cladding · £50,000 · 14 Feb 2025
- Salford Crescent - Civils · £500,000 · 11 Nov 2024
- Salford Crescent - Drainage · £500,000 · 11 Nov 2024
- Salford Crescent Station - Structural Steel · £1,000,000 · 29 Oct 2024
- Salford crescent Station - Final Clean · 29 Oct 2024
- Salford crescent Station - Scaffolding · £25,000 · 29 Oct 2024
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.