Sanders
key details
| Value | £350,000 |
|---|---|
| Status | planned |
| Category (CPV) | 63711000 +1 more |
| Contract start | 1 Jun 2016 |
| Contract end | 11 Sept 2016 |
| SME suitable | No |
| OCID | ocds-b5fd17-5a93a452-adc9-11e6-9901-0019b9f3037b |
description
Lot 1 – Designing, planning, managing and analysing results from braking tests aimed to determine the improvement in braking performance, in simulated low adhesion conditions, that can be achieved with a single sander that varies its delivery rate with speed compared to a single fixed rate sander, and also with the benefit of distributed sanders.
Lot 2 – Designing, planning, managing and analysing results from train detection tests on a number of different track circuits to determine the upper limit of sand density (in terms of g/m) that leads to a wheelset becoming isolated from the rail – resulting in a loss of track circuit detection – and determine how many wheelsets are required to disperse sand laid at this rate before sand can be re-applied.
Additional information: RSSB is seeking to understand the implications of distributed sanding and variable rate sanding for train braking capability in low adhesion conditions and the impact this will have on track circuits and train detection.
RSSB will be inviting suppliers to participate in an open tender for provision of services to the work. The work will be divided in two lots:
Lot 1 – Designing, planning, managing and analysing results from braking tests aimed to determine the improvement in braking performance, in simulated low adhesion conditions, that can be achieved with a single sander that varies its delivery rate with speed compared to a single fixed rate sander, and also with the benefit of distributed sanders. For this lot RSSB will source trains and test track for the testing.
Lot 2 – Designing, planning, managing and analysing results from train detection tests on a number of different track circuits to determine the upper limit of sand density (in terms of g/m) that leads to a wheelset becoming isolated from the rail – resulting in a loss of track circuit detection – and determine how many wheelsets are required to disperse sand laid at this rate before sand can be re-applied. For this lot RSSB expects the supplier to source train and track for testing.
We are keen to engage with suppliers who have capabilities and experience in on-track testing, braking systems and sanders (including interaction with brake control systems and wheel slide protection), train detection and vehicle modification. We would like to hear from suppliers who can demonstrate experience of testing involving multiple parties.
NOTE: To register your interest in this notice please email Shareditt@RSSB.co.uk, stating ‘Sanders Tender’ in as the subject.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Nov 2016 | Planning (planning) | · | adfb6081-e184-4715-9a62-c313d2b2f0f8-88671 |
more from RAIL SAFETY AND STANDARDS BOARD LIMITED
- T1305 - Codify the impact of professional driving policies and defining best practice guidance · 20 Apr 2022
- T1261 - The use of AI in the Context of Spoken Safety Critical Communications · 27 Jan 2022
- T1273 Optimising drivers' use of audible warnings in all potential warning scenarios · 24 Nov 2021
- T1244 Characterising the Pantograph and Overhead Contact System · 20 Jan 2021
- T1223-02 Wheelset Coating Systems and Good Practice Guidance · 26 Nov 2020
- T1210 ADHERE Sander quality and performance criteria framework · 25 Aug 2020
- T1219-02 RESILIENT: Anti-icing and de-icing mitigations for pantograph and Overhead Line Equipment · 29 Jun 2020
- T1214 DECARB: 21st Century DC electrification infill · 5 Jun 2020
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Tees Valley Rail Timetable Analysis · Tees Valley Combined Authority · £88,800
- TfL Safety Critical Labour Supply · Transport for London · £44,000,000
- emergency works Wheatley Park Emergency Slip Network Rail Form C · defra · £27,564
- YNE-Asset recovery works- Arksey Floodwall- Form C- Network Rail- BAPA · Environment Agency · £32,305
- DSRL DFR Material Transport Security Support · CTM Portal for the NDA Shared Services Alliance
- Planning Design Organisation (PDO) for Depots and Stabling · Transport for London · £585,488
- RSSB1996 Testing Voucher Scheme · Rail Safety and Standards Board (RSSB) · £450,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.