Thames Court Footbridge - Remedial Works
key details
| Value | £550,000 |
|---|---|
| Status | active |
| Category (CPV) | 45221113 |
| Region | London |
| Deadline | 6 Aug 2018 |
| Contract start | 5 Nov 2018 |
| Contract end | 21 Dec 2018 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-5a608bc5-6dfe-420a-94b3-45a649204288 |
description
Works Scope
The remedial works to Thames Court Footbridge (over Upper Thames Street) comprise the following principal elements: -
| A. | Replacement of two cable stays to the bridge and re-tensioning of all stays, over carriageways and footways to Upper Thames Street |
| B. | Bridge drainage maintenance cleaning and improvements |
| C. | Replacement of stone stair treads to north and south stair flights |
| D. | General maintenance cleaning/washing of soiled paintwork to structural members of bridge/stairs, together with cleaning/washing of retained footbridge paving |
In order to implement items A, B and C, it is envisaged that full closures of Upper Thames Street to vehicular traffic in both directions will be required, which will not be possible during the working week.
It is expected that these works (A to C) can be completed within two weekend closure to traffic, although - as a safeguard- three weekend closures are being arranged with Transport for London within the contract period for this purpose.
The Cycle Superhighway is not to be closed during the works under any circumstances. If necessary, a local reduction to the width of the cycle lane will be permitted, with appropriate traffic management and measures to protect cyclists and pedestrians during key safety-critical operations (e.g. lifting or removal of bridge stays), to the prior approval of the highway authority (TFL)
Preliminary traffic management and diversion drawings have been produced, for the purposes of obtaining the necessary road closures and traffic orders in advance. However, the contractor will be responsible for developing these outline drawings into full working traffic management drawings, to the approval of the highway authorities (TFL and City) and for providing all traffic management and signage Due to the lead-in times for stone paving for the stair treads, these are being procured in advance by the City directly. The contractor will be responsible for taking delivery of and offloading these units and storing for use during the project.
Additional information:
Please register on capitalEsourcing and find the opportunity under itt_CoL_8873.
documents
- https://www.contractsfinder.service.gov.uk/Notice/4ecc3de7-8c59-4b67-9560-e3f040e82edf , tenderNotice
- http://www.capitalesourcing.com , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 8 Aug 2018 | Tender (tender) | · | 4ecc3de7-8c59-4b67-9560-e3f040e82edf-233628 |
more from City of London Corporation
- Dispute Resolution Consultant for Sydenham Hill Project · £30,000 · 20 Jan 2026
- Guildhall Chilling/Humidification Plant Replacement · £97,884 · 3 Dec 2025
- Legal Advisory Services in Relation to the Barbican Renewal Project · £77,910 · 28 Oct 2025
- Common Data Environment for the Barbican Renewal Programme · £50,900 · 8 Jul 2025
- Pan London Homeless Substance Misuse Programme – Combined In Patient Detoxification Unit for London · 11 Mar 2025
- Pest Control Provision for Housing Estates · £63,000 · 27 Feb 2025
- Comms Consultancy · £88,590 · 26 Feb 2025
- Barbican Lucy Raven Exhibition · £108,580 · 26 Feb 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Fraserburgh-Inverallochy Path - Bridge Fabrication · Aberdeenshire Council · £117,203
- Provision for Lee Valley White Water Centre Bridge Repairs - AWARD · Lee Valley Regional Park Authority
- Supply of 4 No. FRP Resin Infused Footbridges · The North Yorkshire Council · £100,000
- Demolition of pedestrian footbridge at Bourton Park · Buckingham Town Council · £30,000
- To enter into a Basic Asset Protection Agreement (BAPA) to be able to carry out the consultation / liaison for removal and replacement for Priory Drive footbridge · Hull City Council · £43,046
- ERCF2213N Plas Bychan Footbridge LlanfairTH · Conwy County Borough Council
- Calverley Lane Footbridge · Leeds City Council
- Footbridge Replacement · City of Doncaster Council
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.