key details

Value£50,000
Statusactive
Category (CPV) 71332000 +1 more
Deadline22 Sept 2025
Contract start29 Dec 2025
Contract end5 Jan 2026
SME suitableYes
OCIDocds-b5fd17-5a213a0f-e278-48a4-9363-179a3c404599

description

The section of brickwork at Roade Cutting is defective and requires permanent repair, and is circa min of 5metres wide by 3metres high and 300mm think (to be confirmed by coring). JMS believe that sprayed concrete would be a viable solution in providing a permanent repair. The work is scheduled to be undertaken during a Christmas Blockade 29th December 2025 to 5th January 2026.

Subcontractor is to apply the spray concrete with stainless steel mesh and fixings and anchoring. The possession starts on the 29th December 2025 at 12.00 and ends 5th January 2026 at 04.10. Because of the time of the year we will also look at installing a temporary works scaffold with encapsulation in case of low temperatures and this will allow yourselves access to carry out the work. JMS will provide all welfare, RRVs / trailers, safety critical staff, isolation, temp works with encapsulations.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
8 Sept 2025 Tender (tender) · 598e39d0-66ea-4f28-822a-5bd92f1b6fa2-862470

more from J Murphy & Sons Limited

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.