CS046-Energy_Efficiency_Improvements_Newton_Park_Bath
key details
| Status | planning |
|---|---|
| Category (CPV) | 71313000 +5 more |
| SME suitable | Yes |
| OCID | ocds-b5fd17-54afdfae-e480-4954-9836-3b1e12cf17f4 |
description
Early Supplier Engagement Request:
Bath Spa is looking for a Main Contractor/Consultant to enter into a Pre-construction services agreement to achieve the following Goals:
Contribute to the design process itself.
Advise on buildability, sequencing, and construction risk.
Advise on the packaging of the works (and the risks of interfaces between packages).
Advise on the selection of specialist contractors.
Help develop the cost plan, and the construction program creates the method of installation.
Obtain prices for work packages from sub-contractors or suppliers on an open-book basis.
Prepare a site layout plan for the Installation stage showing temporary facilities.
Draft the preliminaries for specialist and trade contractor bid documents.
Background
Bath Spa University (BSU) has a long and successful track record in energy efficiency improvements and decarbonisation. Our goal is to achieve net zero CO 2 emissions by 2030.
Requirment:
This requirement is for the Commons DHN, including all associated energy centre plants, the buildings' interfaces, and the TREND controls. We have an incumbent TREND BEMS service provider, who we expect to be engaged with any changes to the existing protocols. The project shall include funding from Salix or equivalent sources. Therefore experience working on these projects would be advantageous.
The most significant challenge in this regard is the decarbonisation of heat in our main Newton Park campus. Heat is currently provided to most buildings on the campus via two hydrologically-separated district heating networks (DHNs). These are known as the "Commons" and "Gardens" DHNs.
Heat to each DHN is currently provided via a 500 kW Froling woodchip boiler and supplementary gas backup. Each system's biomass and gas plant is co-located in two
"energy centres". BEMS control is via a TREND system.
As part of our decarbonisation strategy, we are working on the optimisation of these DHNs to;
- a.Optimise energy efficiency
- b.Maximise use of our existing biomass plant and;
- c.Prepare the systems for conversion to heat pump technology.
- d.Consider the fabric of the building and ensure these are optimised to provide optimum effectiveness of the mechanical and electrical works.
In 2021, we commissioned a feasibility study to understand the scale and nature of the works required, the potential optimisation gains in terms of energy efficiency and biomass use and the challenges we will face in converting the systems to heat pump technology. This will be made available at the tender stage.
If this opportunity is of interest to your organisation as a complete package or parts off. Please register your interest for consideration and further information.
To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/45X55G5X7Y.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 27 Sept 2022 | Planning (planning) | · | 0771ff7a-2066-480d-9d3d-ba4083819497-575322 |
more from BATH SPA UNIVERSITY
- Azure Landing Zone and Virtual Desktop Project · £82,500 · 9 Jun 2026
- Panopto Recording and Captioning service · £72,000 · 9 Jun 2026
- Laptop Loan - macOS Devices + Cases · £38,317 · 9 Jun 2026
- MacBook Airs - Nov 2023 · £31,784 · 9 Jun 2026
- NP & LR data centre extended hardware support (12 months) · £61,270 · 9 Jun 2026
- Renewal of support for Locksbrook data centre · £36,150 · 9 Jun 2026
- Carriageway repairs NP · £80,460 · 8 Jun 2026
- Loan Laptops (Windows) 05/2025 · £156,488 · 2 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Sustainability Consultant Framework · Victoria and Albert Museum · £450,000
- Appointment of Independent Expert · Aberdeen City Council · £100,000
- Sustainability Framework · The Crown Estate · £6,000,000
- RFQ for RIBA Stage 2 Compliant Whole Site Decarbonisation Plans for Two Oxford City Council Depots - AWARD · Oxford City Council
- Ecology & Hydrology Surveys and Assessments · ANGLIAN WATER SERVICES LIMITED · £141,730,233
- Environmental Abatement Technology Standard Professional Services Contract - Extension · MCA - Maritime and Coastguard Agency · £60,000
- Aberfoyle Flood Protection Scheme Outline Design · Stirling Council · £111,843
- Great British Energy Technical Due Diligence Advisors 2026-2029 · Great British Energy · £10,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.