gvtcx

SC19053 - Fish & Eel Passage - River Stour

Kent County Council Published 20 Mar 2020 Contracts Finder

key details

Value£100,000
Statusactive
Category (CPV) 45247220
RegionSouth East
Deadline17 Apr 2020
Contract start5 Jun 2020
Contract end31 Oct 2020
SME suitableYes
OCIDocds-b5fd17-08ad4775-7e75-448a-a639-c84104b0c09e

description

This is a Below OJEU threshold procurement, the procedure can be found in the tender documentation Suppliers can access the tender documentation by submitting an expression of interest via the Kent Business Portal via the following link https://procontract.due-north.com/Advert?advertId=cb4bd6b3-906a-ea11-80ff-005056b64545&p=8691483f-2f3d-e711-80e1-005056b64545 The requirement is for the construction and installation of Lariner Fish Pass on the River Great Stour at Olantigh Estate

The River Stour is the second longest river in Kent and is the major watercourse in the east of the county. The Great Stour's source is 75m above sea level near the village of Lenham, north-west of Ashford. The Great Stour then flows through Wye and the chalk North Downs to the cathedral city of Canterbury and then flows East and out to sea at Pegwell Bay.

The works are in the River Great Stour from Wye to the A2, GB107040019742 (Water body id).

On leaving Wye the Stour flows in a north easterly direction, breaching the North Downs through the 'Wye Gap', and for most of this distance there are few tributaries, although the river interacts significantly with the groundwater and takes on many of the characteristics of a chalk stream.

The river is primarily rural in character for this section, passing through the grounds of some grand country houses. At Olantigh the river bifurcates and passes through 107 hectares of park and pleasure grounds of a mid-19th century private residence.

At Olantigh there are three structures which impact on fish passage, on these two channels.

The Waterbody Improvement Plan, 2017, undertaken by the Environment Agency states this section of the Stour as moderate and the reason for not achieving good ecological status as being due to water quality (particularly phosphates), low flow and fish passage.

Fish were in poor status as recently as 2010 but have recovered; further improvements are required if we are to achieve an improvement in overall status. Fish passage has been improved downstream through Canterbury.

The works are everything necessary for the construction and installation of a new Lariner Fish Pass and Eel Pass on the River Great Stour at Olantigh Estate. This includes the provision of temporary works to allow its construction in the river, reinforced and mass concrete, aluminium baffles, safety railings, top soiling and seeding and scour protection.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
20 Mar 2020 Tender (tender) · 969f97c8-55e1-489e-b483-18d31bd513c5-350931

more from Kent County Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.