UPS WP1- Groundworks and Bin Stores - AWARD
key details
| Status | complete |
|---|---|
| Category (CPV) | 45000000 |
| Deadline | 13 Feb 2025 |
| Contract start | 3 Mar 2025 |
| Contract end | 2 Mar 2026 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-504fa8cb-b5df-41a9-9966-fe8ff41748c2 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| FEG Ltd | £63,129 | 3 Mar 2025 | active |
description
CPI, located at John Walker Road, Sedgefield, TS21 3FE, is currently facing operational challenges due to frequent brownouts at their Coxon building. These power inconsistencies have led to periodic shutdowns, which disrupt critical operations and pose risks to ongoing activities at the facility.
To mitigate these power issues, CPI is seeking proposals for the various work packages to result in installation of an Uninterruptible Power Supply (UPS) system along with a generator link for future installation. The primary objective is to ensure seamless power continuity, thereby preventing future brownouts and enabling uninterrupted operation during power fluctuations.
This project has been split into several RFQ's and suitably qualified vendors are invited to quote for one or more tenders. The aims are to select qualified contractors to design, supply, and install the necessary infrastructure to support CPI's operational needs, aligning with their ongoing commitment to innovation and sustainability.
CPI requires a suitable contractor to relocate the existing Bin Store, to supply and construct a new smaller bin store, approximately 4 meters by 3 meters, with a new concrete base and basic internal lighting. Groundworks required following the relocation of the existing Bin Store include excavating the existing concrete slab and casting a new, suitably thick base to support the new UPS GRP enclosure and its contents.
The successful contractors will be required to deliver the necessary stages to ultimately provide a robust and efficient power solution, which will include integrating the UPS system and generator link into the existing electrical network. All work should be carried out in compliance with current regulations and best practices to meet CPI's high standards for safety, reliability, and performance.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 10 Mar 2025 | Award (award) | · | 2398162f-4a8b-48a8-bdd3-d4789c959cb2-832817 |
more from CPI (Centre for Process Innovation)
- Supply of 2no 10L Techfors S - AWARD · 12 Jun 2026
- Provision of Mains Gas - AWARD · 28 Apr 2026
- Statutory Audit and Financial Compliance Checks - AWARD · 27 Apr 2026
- PerkinElmer Equipment OEM Service Contracts - AWARD · 23 Feb 2026
- Microbalance (2423 Calloff) - AWARD · £40,605 · 23 Feb 2026
- Automated cell counter system - AWARD · £122,529 · 13 Feb 2026
- Equipment (Mass Specs) maintenance cover for Chromeleon Software (2714 Calloff) - AWARD · £52,370 · 11 Feb 2026
- HPLC for use with MALS detector(2714 calloff) - AWARD · £71,411 · 9 Feb 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Tickford Park Primary School SEND Unit · Milton Keynes Council · £101,188
- Cleeve and Yatton Small Transport Hubs · North Somerset Council · £116,495
- Lowca Community School - Damp remediation works · Cumberland Council · £47,080
- L9-102 ATE Monument Roundabout · North Lincolnshire Council · £198,564
- 26160 - Changing Rooms - AWARD · Telford and Wrekin Council · £21,137
- 52 No New Housing Units, Rosskeen, Ross Shire · Highland Council · £13,846,870
- PKC13981 Methven Primary School – Replacement Dining/Gym Hall · Perth & Kinross Council · £3,773,222
- Valley Primary School - Partial Roof Replacement · Cumberland Council · £62,775
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.