SASWP03.2 - Rail Systems - Signalling, Telecoms, E&P (LV), P-Way, Civils
key details
| Value | £2,500,000 |
|---|---|
| Status | active |
| Category (CPV) | 31321300 +6 more |
| Region | West Midlands |
| Deadline | 31 Mar 2021 |
| Contract start | 25 Jun 2021 |
| Contract end | 30 Jun 2022 |
| SME suitable | No |
| OCID | ocds-b5fd17-4f634956-7a8d-48de-b74d-bcab32b73937 |
description
Skanska SAS13 Bridge Replacement - Rail Systems WP03.2 Scope
- Signalling:
Assets to be disconnected and reinstated during blockade:
- 1 No. Signal
- 2 No. Axle counters
- AWS
Cabling to be Disconnected and Renewed:
- AWS
- 2c Power cables to LOC's
- 2C data cable
- Axle cable tail cables
- 2pr cable to axle counter
- Axle counter 10pr multicore cables
- Telecoms:
Cable replacement Fibre Optic and copper:
- 30pr C STUB SCYA B cable (30pr C STUB SCYA B cable (blockade)
- 24f F SPUR SCYA
- 48f F BIMC NUNC A
- 48f WCML (blockade)
Testing of Signalling cables:
- Copper cables 2 x 10pr and 1 x 2pr telecoms cables used for Signalling functions
- E&P (LV)
240V DNO Power Supply to Star City TEH
Diversion in temporary route:
600lm Cable Installation through existingDBP3 Cess Trough Route, 5 Track UTX, 2no. URX's and elevated trough route.
Testing and commissioning of supply and EIS of THE DNO Power.
Cable Diversion in New Route:
600lm Cable Installation through existing DBP3 Cess Trough Route, New Viaduct Cable Route and 1 no. Dual Track UTX.
Removal of Temporary DNO Cabling
- Track:
Stage 1 Track - Pre Blockade - Weekend Disruptive Possessions:
- Full Track Reconstruction of Circa 50lm of Dual Track Rail inc 7.5m Ballast Ramps at tie-in
- 115lm of Lift and Slew on Approaches, both roads.
Stage 2 Track - Main Blockade
- Removal of 200lm of Dual Track at commencement of Blockade to facilitate Civils Works
- Full Track Reconstruction of Circa 200lm of Dual Track Rail inc 7.5m Ballast Ramps at tie-in
- 350lm of Lift and Slew on Approaches, both roads
- Installation of 2 no. CEN 60 Structural Expansion Joints (SEJ)
- Installation of 2 no. CEN 60to CEN56 Track Adjustment Switches
All Track Works Include:
- Install New & Serviceable Rails, Sleepers, Top & Bottom Stone, Geogrid Membrane and Tamp & Line Welding & Stressing, Follow Up Tamping, CRT Management
- Civils:
Dual Track UTX:
Installation during Blockade, 6 Way Multiduct, 2 no. 1.2m proprietary chambers. Circa 12m Long
Track Side S&T Route
100lm of TTS 200 or similar Troughing in Cess, inc 2 no. connections to UTX.
Temporary S&T Route 300lm Cable Trough Route Removal
6)
Supply of Track, Signalling, Telecoms & E&P CRE for Works
Supply of Signalling and Telecoms Testers for Works
Supply of Rail System Manager, embedded within SAS 13 Project Team to Manage all Rail Systems Disciples Tenderers will be issued a formal invitation to tender (ITT) with a pricing and submission document to complete.
The submission will included a balanced scorecard requesting answers to questions (along with evidence) to be submitted for review and scoring. The highest scoring tenderers will be considered preferred tenderer for the works. High level criterial of the balanced scorecard questions will include:
Health & Safety
Quality
Sustainability
Environmental
Competence
Capability
Capacity
Commercial Price
Mid tender reviews will be held prior to the submission deadline to review the scope of works with the SAS13 project team. Following the submission deadline, there will be post tender reviews to review your submissions with the SAS13 project team.
Best and final offers may be requested from tenderers.
Skanska have been employed by Network Rail (NR) to replace the existing SAS 13 bridge to increase lateral clearance below the structure to enable the construction of HS2's new depot access lines and access to the new HS2 depot via road. The existing bridge forms the rail intersection between the Stechford to Aston (SAS) line and the Birmingham to Derby Line (DBP3).
The new bridge will be a 92m single spanning structure. Skanska's appointment by Network Rail includes the design and demolition of the existing bridge and installation of the new structure.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=54561037 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/fabeac39-1a32-486f-a7af-4015181ed5d0 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 23 Mar 2021 | Tender (tender) | · | fabeac39-1a32-486f-a7af-4015181ed5d0-422432 |
more from Skanska Infrastructure (Rail)
- CP7 Framework - Clifton Bridge - Miscellaneous Steelwork · £250,000 · 24 Mar 2025
- CP7 Framework - Clifton Bridge - Site Media · £50,000 · 24 Mar 2025
- CP7 Framework - Clifton Bridge - Waterproofing · £1,000,000 · 11 Mar 2025
- WP57 - Anti Graffiti · £25,000 · 14 Oct 2021
- SASWP36 - Birdproofing · £15,000 · 26 Aug 2021
- SASWP14 - GRS Staircase, Parapets, Cess Walkways, Stairs · £150,000 · 14 Jul 2021
- SASWP49 - Track Protection · £100,000 · 5 Jul 2021
- SASWP10 - Pre-Cast Abutment Supply · £500,000 · 18 May 2021
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Cooling Compound Upgrade - ORE/24/042 · Offshore Renewable Energy Catapult · £49,107
- OO Supply and Deliver # 132kV City Cable - LT236 Redmoss/Clayhills 1124 · SSE plc or (please enter the correct contracting entity)
- High-voltage Cable Diversion · Wyre Forest District Council · £31,619
- High Voltage Network Improvements · Dorset County Hospital NHS Foundation Trust · £66,631
- Senior Authorised Person Services · Offshore Renewable Energy Catapult · £60,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.