gvtcx

Library Boiler Replacement Project

HE Portal Published 29 Jun 2017 Contracts Finder

key details

Value£70,000
Statusactive
Category (CPV) 42160000 +5 more
RegionLondon
Deadline13 Jul 2017
Contract start21 Jul 2017
Contract end1 Aug 2017
Procedureopen
SME suitableNo
OCIDocds-b5fd17-4b9da0d3-e0b7-4ce8-b640-1ca2e1845ce7

description

The Building Services Contractor shall be responsible for the full detailed design, supply, and installation and commissioning of all mechanical services works associated with the project. The Building Services Contractor shall be responsible for carrying out the strip out of 2No. existing boilers and associated pipework/low loss header, the re-installation of the recently installed Remeha boiler, the installation of a brand new Remeha boiler, reconnection of the boilers to the existing system via an air dirt separator unit, and commissioning of the system.

Additionally the contractor shall be responsible for the strip out of the existing domestic hot water cylinder and associated pipework, followed by the installation of a new gas fired AO Smith cylinder and reconnection into the existing domestic hot water distribution pipework. The contractor shall note that the new cold water feed shall pass through heat recovery modules linked to the existing chiller and new boiler flues.

Additional information:

Is a Recurrent Procurement Type? : No

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
29 Jun 2017 Tender (tender) · e1630170-c27e-4cf7-9a68-2eff4549d630-157510

more from HE Portal

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.