gvtcx

Redisher Wood Bridge Refurbishment 2018, Ramsbottom

Bury Council Published 10 Jan 2018 Contracts Finder

key details

Value£70,000
Statusactive
Category (CPV) 45000000
RegionNorth West
Deadline2 Feb 2018
Contract start12 Mar 2018
Contract end20 Apr 2018
Procedureopen
SME suitableYes
OCIDocds-b5fd17-49ad808c-a402-4350-af86-25a302853853

description

Redisherwood Bridge is located in rural area with restricted access off Redisher Lane (off Bolton Road), Ramsbottom and carries Public Footpath No°14 across Holcombe Brook. The Bridge is a single span masonry arch structure with an overall span of approximately 2.8 m and an overall width 1.45m. The works required include (but are not restricted to): • Site clearance (including saplings and trees within 5m of bridge superstructure and training walls). • The taking up/down of masonry training walls and rebuilding along existing lines with a maximum retaining height of 2.1m. • The taking up/down/repair spandrel walls. • Construction of squared random rubble stone parapets to bridge • Provision of timber parapets to training walls • Masonry repairs, pointing and pressure grouting of existing abutments and arch ring. • Working at heights of up to 2.1m above, in and about, and adjacent to a watercourse (Classed as main river by the Environment Agency)

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
10 Jan 2018 Tender (tender) · 80242458-9d40-4de2-9c9a-2f026299edff-190665

more from Bury Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.