gvtcx

Non-Active Drains Optimisation Works

CTM Portal for the NDA Shared Services Alliance Published 30 Apr 2021 Contracts Finder

key details

Statusactive
Category (CPV) 45000000 +5 more
Deadline31 May 2021
Contract start12 Aug 2021
Contract end23 Aug 2022
Procedureopen
SME suitableYes
OCIDocds-b5fd17-4957edf3-8d27-48e6-b752-95bd0fcdef66

description

Dounreay Site Restoration Limited (DSRL) have developed a design and scope for the Optimisation Works to upgrade the existing Non-Active Drain Installation at the Dounreay Nuclear Decommissioning Site which requires construction and when constructed, will deliver several capital maintenance items identified as required to be addressed following repeated non-compliances with SEPA waste management license. The objective of the project is to provide a passive and non-intrusive solution which will provide robust and reliant compliance with the suspended solids limits set by SEPA by modifying four existing CSOs and constructing two new treatment plants, both capable of treating greater than Formula A / 6DWF before discharging to the Atlantic Ocean through existing outfall pipes.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
30 Apr 2021 Tender (tender) · 0bf0a759-6511-402f-86bd-dfaf053aa530-432958

more from CTM Portal for the NDA Shared Services Alliance

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.