key details
| Value | £111,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45221100 +1 more |
| Deadline | 28 Feb 2022 |
| Contract start | 12 May 2022 |
| Contract end | 31 May 2022 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-4935be4b-79fd-4448-9b66-925dabcd962c |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Amalgamated Construction Ltd | £74,230 | 21 Apr 2022 | active |
description
orserv on behalf of Cormac Solutions Ltd wish to appoint a suitably experienced and qualified contractor to undertake bridge repair works at Newham Trails Truro, under an NEC Option A ECS (Engineering & Construction Subcontract).
*Full Scope of Works:
- The Bridge Repairs package for the Newham Trails including supply of all materials, labour and plant necessary to provide the items shown on the Subcontract Works Information as summarised below :
Arch Hill Bridge and Penweathers Rail East Bridge
All as shown on Drawings CN2000551-CSL-SBR-SW819433-DE-C-0001-A2 Rev C02 and DE-C-0002-A2 Rev 02
A Repairs to timber deck, transverse beams Cross Transverse and New Longitudinal timbers
B Remove damaged bottom flange and replace with new mild steel grade S275 JR or wrought iron plate of 12mm thickness.
C A mild steel spacer plate grade S275 JR is to be installed securely to support longitudinal timber bearing strip D Mild steel spacer and new plate if made from mild steel to be primed and external faces painted black with suitable colour E Installation of Temporary Access Ramp and Bridge Protection
F Temporary Works scaffolding
NOTE - this package does not include
- Groundworks
- Streetlighting
- Rock anchoring, rockfall netting and fencing
- Fencing/gates
- Vegetation and scrub clearance, tree felling or pruning, planting or herbicide treatment areas.
IMPORTANT NOTEs -
Tenderers are required to submit an Option A Activity Schedule price with the activities reasonably broken down to resemble the programme.
Tenderers are required to submit a programme
Tenderers are required to complete Subcontract Data part 2 and return with their submission.
Specific Works Location & Restrictions
Access will be controlled by Cormac Solutions Ltd site management team
Relevant contacts and telephone numbers for site visits and technical queries:
- - Andy Berryman - Project Manager - 07875 648 966 - Andrew.Berryman@cormacltd.co.uk
- - David Vaughan - Project Surveyor - 07871 983 498 - david.vaughan@cormacltd.co.uk
The intention is to award the contract to the most economically advantageous tender based on 80% Price and 20% Quality To access the online question template and supporting documents, express an interest and then click the "start my response" button
documents
- https://www.contractsfinder.service.gov.uk/Notice/8fd7a762-94d5-4ae7-83ba-7f2c7713fe10 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 11 May 2022 | Award (award) | · | aa2fcb08-1c52-435c-9f5b-b65f866c5a69-536463 |
more from Corserv Limited
- Poundstretcher Refurbishment, Penzance, Design, Supply and Install Lift and Platform Lift · £100,000 · 7 Nov 2024
- Poundstretcher Refurbishment, Penzance, Structural Steelworks · £50,000 · 6 Nov 2024
- Langarth Village Phase 1 Supply & Installation of Steel & Timber Handrails · £50,000 · 4 Oct 2024
- Langarth Garden Village - Allotment Building · £150,000 · 3 Oct 2024
- 1-8 Riverside View Saltmill Saltash - Demolition · £150,000 · 18 Sept 2024
- 10 Pendower Road Veryan- Major Void Works · £185,000 · 5 Sept 2024
- 1 Langreek Bungalows Polperro - Blockwork Boundary Wall · £100,000 · 22 Aug 2024
- Trevithick Manor Farm S278 - Block Paving Works · £100,000 · 15 Aug 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Liss Bridge Works · East Hampshire District Council · £40,070
- Barrier Safety Improvement Scheme · Humber Bridge Board · £5,000,000
- Centurion Way combined footway and cycleway works: Cucumber Farm to Littlewood Bridge · South Downs National Park Authority
- HNL - AOMR - Charville Lane access bridge replacement · Environment Agency · £168,006
- Moorside & Wardley Railway Bridge Refurbishment Scheme · Salford City Council · £134,420
- HNL - AOMR - Cottage Weir North Footbridge · Environment Agency · £82,973
- Milner Lane Culvert Rebuild (L1255) 2025 · Leeds City Council · £21,300
- Westgate Fb (L2241) Concrete Repairs 2025 · Leeds City Council · £12,650
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.