PHE - 170381 Electrical Distribution Boards
key details
| Status | active |
|---|---|
| Category (CPV) | 31000000 |
| Deadline | 3 Dec 2018 |
| Contract start | 19 Dec 2018 |
| Contract end | 18 Nov 2019 |
| Procedure | open |
| SME suitable | No |
| OCID | ocds-b5fd17-48071a7b-5796-4116-969c-e837c15c1513 |
description
The main building (01) electrical busbar system and parts of its distribution system has been in place for over 50 years and is in need of statutory testing and maintenance. Although currently safe to operate, there is a need to carry out testing on the Busbar, associated cabling (including testing of new Acti boards already fitted) and replace obsolete distribution boards within the service floor and basement.
In broad terms, the scope of this project is to carry out a series of tests on the existing Busbar and downstream circuits, replace all existing obsolete MEM distribution boards with Isobar Schneider Acti 9, replace the Lecture Theatre (LT) LV switch-board main isolating switch with a new Air Circuit Breaker (ACB) and carry out LV maintenance on LT LV switchgear.
The contractor is to be supply all parts, plant, equipment and labour required to carry out the works.
Provide and manage all generator back up as required. To be demonstrated at tender stage.
Provide all contingency in the event of power no being able to be restored in any area as required. To be demonstrated at tender stage.
Pre-work surveys must be carried out by the contractor to satisfy themselves of the scope.
Issue of all test certification, update, O&M's, H&S File on completion of each zone.
The contractor will act in the role of PC and PD if required.
The works will take place during week long shut-downs, January - September 2019, corresponding to an area of the main busbar.
The technical specifications are contained within the attachment section on the PHE.Bravo portal and are listed below:
| 1. | PHE- PD- WI-170381 |
| 2. | PHE-PD-URS-170381-Power Distribution Boards Oct 2018 - Draft |
| 3. | Pre-construction info pack Power Distribution Boards_ |
There are also other relevant documents that have been included within the attachment section of the Bravo e-tendering portal ITT form for information and these will require referencing to submit a full response.
Additional information:
To view and apply for this opportunity you will need to be registered or to register with PHE.Bravo
documents
- https://www.contractsfinder.service.gov.uk/Notice/08195bb4-4335-4b86-9061-416f02d0d57a , tenderNotice
- https://phe.bravosolution.co.uk , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 19 Nov 2018 | Tender (tender) | · | 08195bb4-4335-4b86-9061-416f02d0d57a-253267 |
more from Public Health England
- NHS SBS services to provide payroll roll UKHSA (previously Public Health England) · £478,833 · 5 Dec 2023
- PHE- Capital (works) Porton FM Hard Services · 17 Oct 2023
- Pro Works & Lobby Works · £60,501 · 18 Apr 2023
- PHE Steam Resilience Works · £8,480,000 · 18 Apr 2023
- PHE_Scientific_Purchase of Ultra Low Energy ULT Freezer- LUPC LAB5061 SU - Lot 5 · £269,910 · 14 Apr 2023
- PHE_Scientific_Purchase of Tube Picker and Tube Rack Adaptor- LAB5061_LU · £76,250 · 14 Apr 2023
- PHE_Scientific_Purchase of -80degree Freezers_LAB5061_LU · £90,016 · 14 Apr 2023
- PHE - Corporate - ICT - High Performance Computing Azure via autoscaling · £90,656 · 14 Apr 2023
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- WHHT - WGC Emergency Lighting Fire Improvements · West Hertfordshire Teaching Hospitals NHS Trust · £175,000
- Christmas Lights and Decorations · Burnham on Sea & Highbridge Town Council · £120,000
- Minor Works and Small Projects (MWSP 2) - North England · Crown Commercial Service · £33,200,000
- EPP0266 Warden Call System · Castle Point Borough Council · £340,000
- Bedford Town centre Christmas Lights 2026 to 2030 (Hire Supply) - AWARD · Bedford Borough Council
- Offsite Construction Solutions - Lot 6 modification · Crown Commercial Service · £10,000,000,000
- Construction Works and Associated Services · Crown Commercial Service · £30,000,000,000
- RHUL-26010 Procurement of Plumbing and Electrical Materials · Royal Holloway and Bedford New College · £343,876
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.