Arun District Council - Strategic Flood Risk Assessment
key details
| Value | £50,000 |
|---|---|
| Status | active |
| Category (CPV) | 71313000 +2 more |
| Region | South East |
| Deadline | 8 Dec 2015 |
| Contract start | 4 Jan 2016 |
| Contract end | 25 Mar 2016 |
| Procedure | open |
| SME suitable | No |
| OCID | ocds-b5fd17-073a8de5-adc9-11e6-9901-0019b9f3037b |
description
Arun District Council would like to commission Consultants to prepare a Strategic Flood Risk Assessment (SFRA) for the area within the Local Planning Authority’s (outside of the National ParK) boundaries that fall mostly within the Arun and Western Streams Catchment Area, and partly within the River Adur Catchment Area.
The key issues to be addressed in this Arun District Strategic Flood Risk Assessment (SFRA) are risks associated with all types of flooding and its implications, both now and in the future, for land use planning. The potential sources of flooding to be included within the study are:
| • | Fluvial Flooding; |
| • | Coastal and Tidal Flooding – including overtopping; |
| • | Estuarial flooding and watercourses affected by tide-locking; |
| • | Groundwater flooding (including interactions between the aquifers and perched water tables); |
| • | Surface water flooding; |
| • | Flooding from overland flows (considering both flood routes/paths and storage); |
| • | Flooding from artificial drainage systems; and |
| • | Flooding from infrastructure failure. |
The intention is to bring together all of the existing flood risk information for the Arun area and to supplement it where required. The study will build on existing modelling and plans i.e. the draft Arun and Western Streams Catchment Flood Management Plan; West Sussex Rifes Catchment Flood Management Plan, Beachy Head to Selsey Bill Shoreline Management Plan; River Arun to Pagham Coastal Risk Management Strategy; Lidsey Surface Water Management Plan and the emerging work for the Aldingbourne Rife Integrated Flood Risk Management Plan and Works (ARIFRM) and the Drainage Area Plans (when available). Plus the existing SFRA, WSCC report on the 2012 flood events, Local Flood Risk Management Plan and Elmer Surface Water Management Plan.
It is envisaged that the study will be carried out in two main stages corresponding with Level 1 and Level 2 Assessments in line with the Planning Practice Guidance; with intermediate stages for consultation, reporting and audit activity.
| • | Stage 1: Data Gathering and evaluation |
| | Stage 1 Interim Report |
| • | Stage 2: Strategic Assessment of Flood Risk. |
| | Stage 2 Draft Report |
| • | Stage 3: Final Report & Deliverables for comments |
| | Stage 3 Final Report agreed and signed off |
Additional information: The tender documents are currently available on the following E-tendering portal and once you have registered you will have full access.
https://in-tendhost.co.uk/sesharedservices/aspx/Home
Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/sesharedservices/aspx/
documents
- https://in-tendhost.co.uk/sesharedservices/aspx/ , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/4df81fce-6262-4948-91e5-268980c50126 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 20 Nov 2015 | Tender (tender) | · | ocds-b5fd17-073a8de5-adc9-11e6-9901-0019b9f3037b-80269-adc---004035 |
more from SE Shared Services
- TDC RP Tree Management Services - AWARD · £600,000 · 3 Feb 2021
- RBBC - IM - Mixed Paper - AWARD · 3 Feb 2021
- BHCC MH Floating Support Service · 1 Feb 2021
- ESCC JC Provision of Services to Remove Bodies on Behalf of HM Coroner (Coroner Removals) - AWARD · 1 Feb 2021
- ESPH AB Hastings Wayfindings (ESPH403 TI) - AWARD · £122,000 · 29 Jan 2021
- WSCC DW Oathall Community College Roof Replacement - AWARD · £55,597 · 28 Jan 2021
- WSCC DW Field Place Roofing Replacement - AWARD · £105,797 · 28 Jan 2021
- WSCC - TH - Manor Field Primary - Flat roof and flooring replacement - Reduced Scope - AWARD · £403,553 · 22 Jan 2021
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Environmental Control Systems · Kent and Medway Mental Health NHS Trust · £294,000
- Sustainability Consultant Framework · Victoria and Albert Museum · £450,000
- Appointment of Independent Expert · Aberdeen City Council · £100,000
- Sustainability Framework · The Crown Estate · £6,000,000
- RFQ for RIBA Stage 2 Compliant Whole Site Decarbonisation Plans for Two Oxford City Council Depots - AWARD · Oxford City Council
- Ecology & Hydrology Surveys and Assessments · ANGLIAN WATER SERVICES LIMITED · £141,730,233
- Environmental Abatement Technology Standard Professional Services Contract - Extension · MCA - Maritime and Coastguard Agency · £60,000
- Aberfoyle Flood Protection Scheme Outline Design · Stirling Council · £111,843
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.