Oldfield Road - E & P Works
key details
| Value | £1,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 31518000 +2 more |
| Region | North West |
| Deadline | 28 Oct 2025 |
| Contract start | 2 Feb 2026 |
| Contract end | 11 Sept 2026 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-421a82cf-56f9-4a70-9e8e-3098585e0107 |
description
This is an enhancement scheme funded by the DfT and is part of a package of proposed measures in the Manchester area that are planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study.
The scheme is for the design and delivery of an East facing turnback, located on the Manchester, Bolton and Bury Line (ELR: MVE1) adjacent to the existing Salford Hope Street (Cemex) sidings between Salford Central Station and the Oldfield Road Bridge.
At Victoria Station, the through platforms also accommodate terminating trains. The extended time to terminate and turnback in the platforms restricts platform availability for through services. The provision of the turnback siding will allow terminating services from the East arriving at Victoria to clear the platform, travel to the turnback siding and await their next turn of duty, clear of the station.
There is the further benefit of an additional stop at Salford Central Station for passengers to disembark for Manchester Spinningfields, a major employment location in the city centre. The turnback would also act as a service recovery measure during times of service perturbation.
The turnback is to consist of two roads, to accommodate trains up to 8 car x 24m in one road and 6 car x 24m in a second road; with access to and from platforms 3-6 at Manchester Victoria via existing connections. The new east facing turnback shall also be able to operate as a berthing/storage siding, with walking routes to allow train crew to access and egress the railway. The turnback will be fully electrified at 25kV and be fully signalled as a route for planned, rather than simply emergency, usage.
The supply, installation, testing and commissioning of the point heating system. This includes, but is not limited to: Mains Distribution equipment, 230v and 110v LV cabling, Heater strips, Heat retainers, Clamp lock heaters, TCBs', PHT's and associated controls.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=101516600 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/29b7a069-e1a4-4fad-85ee-446a93fdb489 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 22 Oct 2025 | Tender (tender) | · | 29b7a069-e1a4-4fad-85ee-446a93fdb489-869107 |
more from Kier Infrastructure and Overseas - CP7 NWC
- Oldfield Road - Telecoms · £250,000 · 22 Oct 2025
- Brewery Turnback - ES6-8 Civil Engineering · £1,000,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 Devegetation Works · £50,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 E & P Works · £100,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 M & E works · £100,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 OLE Civilis / Foundations Works · £5,000,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 OLE Infrastructure · £5,000,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 Permanent Way · £2,500,000 · 7 Oct 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- GB-London: STA1344 - Red Sector Filters · Trinity House · £46,000
- Traffic Signal Maintenance - Mini Competition under the existing CCS (Crown Commercial Service) national framework RM1089 - Traffic Management Technology 2 (Lot 14) · Hull City Council · £690,000
- Street Lighting Testing - Loss of Section Monitoring - AWARD · Sandwell Metropolitan Borough Council
- Installation of Scanlight emergency lighting se;f test system to Student Village in Walsall · UNIVERSITY OF WOLVERHAMPTON ENTERPRISE LIMITED
- Emergency lighting refurbishment - Bernard Katz · UNIVERSITY COLLEGE LONDON · £168,070
- Replacement of Emergency and Communal Lighting · LONDON & QUADRANT HOUSING TRUST · £139,544
- Emergency Lighting Phase 3 Batch Seven · UNIVERSITY COLLEGE LONDON · £710,739
- Lighting Improvements · LONDON & QUADRANT HOUSING TRUST · £197,134
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.