REEF Building

UNIVERSITY OF EXETER Published 30 Sept 2016 Contracts Finder

key details

Value£1,000,000
Statusactive
Category (CPV) 45214000
RegionSouth West
Deadline21 Oct 2016
Contract start30 Oct 2016
Contract end30 Sept 2017
Procedureopen
SME suitableYes
OCIDocds-b5fd17-413c8382-adca-11e6-9901-0019b9f3037b

description

The purpose of the project is to ensure that University of Exeter STEM education infrastructure in Cornwall can meet the demands of both the recent and proposed growth in student numbers and the requirements of research-led and industry-facing science education. In essence, it will enable the research model of multidisciplinary science to be realised in education and attract increased student recruitment.

The Renewable Energy Engineering Facility is a facility where students can experience directly how the knowledge gained in lectures or the laboratory is applied to a number of clean energy technologies in a real-world facility. Elements of the facility may also be shared with other campus users.

This new flagship facility will enable expansion of University of Exeter’s capacity at the Penryn Campus for individual and small group research projects and industrial networking and collab-oration. Users will the complete Renewable Energy teaching programmes including BSc Re-newable Energy and BEng/MEng Energy Engineering.

The project has a maximum net construction value of £1.0m inclusive of Main Contractors OH&P and Preliminiaries.. The Building will achieve BREEAM excellent and incorporate best practice in design, maximising flexibility in the short term whilst providing adaptability in the long term, totalling a minimum of 267m2 GIFA.

Currently the client’s consultancy team (Atkins/Faithful+Gould) have completed the design to the end of RIBA Stage 3 and will be retained by the client to act as Employers Agent, QS and Technical Advisors.

The client has appointed other consultants to assist in the design notably MACH Acoustics (Acousticians) and Ecofirst (BREEAM assessors). Whilst MACH Acoustics will be retained by the client throughout the project it is now likely that Ecofirst commision will end at this stage and it will be for the contractor to appoint a BREEAM assessor to complete the process for RIBA Stage 4 through to completion. The successful contractor will be required to work col-laboratively with the client team to achieve the clients requirements.

Further information about the University’s requirements can be found at Schedule 2: including the specification

Additional information: All tender documents are available for download by registering, for free, on the University's eTendering website InTend; link above.

All correspondence regarding this opportunity are to be submitted via InTend.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Nov 2016 Tender (tender) · 95c670b9-0ecf-4a68-8bc3-33ee3d06d6eb-111133

more from UNIVERSITY OF EXETER

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.