HS2 Limited High Voltage (HV) Power System

HS2 Published 10 Aug 2020 Contracts Finder

key details

Value£328,237,077
Statuscomplete
Category (CPV) 31170000 +15 more
RegionNorth East, East Midlands, West Midlands, London, South East
Deadline21 Nov 2023
Contract start3 Feb 2025
Contract end26 Aug 2049
Procedureselective
SME suitableNo
OCIDocds-b5fd17-40d413a3-3580-4108-b69a-5be07e2c5828

Award

SupplierValueDateStatus
Siemens Mobility Costain JV £328,237,077 20 Jan 2025 active

description

The High Voltage (HV) Power Systems package of work comprises:

  • design, build, testing and commissioning of the High Voltage (HV) traction power systems, 33kV and 11kV non-traction power systems and HV SCADA (Supervisory Control and Data Acquisition) for the HS2 Project.
  • ongoing maintenance activities in connection with the High Voltage (HV) Power Systems.

The HV Traction Power Systems include a traction power electrification system which will be a -25-0-25kV Autotransformer system with a nominal fault current level of 15 kA. The system will be designed to supply traction power into the Overhead Catenary System (OCS) - provided by others to enable the railway operator to run its specified train timetable.

The non-traction power systems will supply all necessary railway systems facilities in tunnels and open route at the appropriate, power demand and system availability. The non-traction power systems will be a dedicated private network distributed within the tunnels and open route supplied by connections to the DNO (provided by the Employer).

The 33kV and 11kV is to be transformed down at specified locations by the contractor to enable the onward supply of LV power (provided by others) to stations, shafts, portals, tunnels and rail systems.

The High Voltage (HV) Power Systems Contractor is the Principal Contractor (PC) for the railway systems compounds. The High Voltage (HV) Power Systems Contractor will supply traction and non-traction power to the HS2 rolling-stock maintenance depot at Washwood Heath (Birmingham), this will include interfacing with the Network Integrated Control Centre (NICC).

The HV Power Systems Contractor is required to provide temporary supplies for construction use at its Railway Systems Compounds (RSC) where it is principal contractor, this may involve adopting the temporary supplies previously provided by MWCC.

This notice also relates to a maintenance contract, pursuant to which the contractor shall provide maintenance services in relation to the completed works. The maintenance contract will be valid for an initial term of 7 years with options to extend and will commence on the first sectional completion of the works under the design and build contract.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
10 Aug 2020 Tender (tender) · 1bc1aa4f-bebd-433b-a06a-e79bec9caa98-375043
20 Feb 2025 Award (award) · 8f1a06f1-b7b5-41e5-a346-93cc3e855f9a-828294

more from HS2

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.