MAMBA MLE
key details
| Value | £38,000,000 |
|---|---|
| Status | complete |
| Category (CPV) | 50660000 |
| Deadline | 25 Jan 2016 |
| Contract start | 30 Apr 2018 |
| Contract end | 31 Mar 2026 |
| Procedure | selective |
| SME suitable | No |
| OCID | ocds-b5fd17-3f7425cf-adc9-11e6-9901-0019b9f3037b |
Awards (2)
This procurement was awarded to 2 suppliers. Values shown are per-award; the notice total is £38,000,000.
| Supplier | Value | Date | Status |
|---|---|---|---|
| SAAB AB Electronic (Defence Systems Division) | £38,000,000 | 25 Jan 2016 | active |
| SAAB AB (Electronic Defence Systems Division) | £38,000,000 | 25 Jan 2016 | active |
description
The Artillery Systems Team, part of the UK Ministry of Defence (“MOD”), intends to award SAAB AB the Mobile Artillery Monitoring Battlefield Radar (MAMBA) Mid Life Extension (MLE) Contract commencing April 2018 addressing end of life equipment/components via technical re-design and re-configuring the Radar equipment within a standardized 12ft container so that the system is vehicle agnostic, this includes obsolescence rectification, equipment modification/re-design, post MLE includes obsolescence management, maintenance, repair and configuration management of the Mobile Artillery Monitoring Battlefield Radar (MAMBA) MLE for a total period of 8 years which includes 5 years in-service support . The estimated value of the contract is £38M including in-service support.
It is considered that this contract can be placed using the negotiated procedure without prior publication as permitted by Article 28(1)(e) of Directive 2009/81/EC (Regulation 16(1)(a)(ii) of the Defence and Security Public Contracts Regulations 2011) for technical reasons because only SAAB AB have the specific technological expertise and knowledge , tools and specialist test equipment to carry out the modification work to deliver the required outputs of the MLE project.
The MAMBA system is a Weapon Locating Radar (WLR) designed, developed and supported soley by SAAB AB. Only SAAB AB have the necessary and specific technological skills and knowledge of MAMBA to be able to provide the re-design and obsolescence support services required by the MOD to deliver the required outputs of the MLE project through-life. As the Design Authority (DA), SAAB AB have ownership of essential drawings, designs, and associated technical data. They have the underlying knowledge, skills and expertise, particularly in the area of ballistic algorithms, required for design and modification elements of the contract. SAAB AB are the only company that has the detailed understanding of the design of MAMBA.
SAAB AB are the only company that can combine technical re-design with maintenance and repair activities with the requirement for supporting the equipment through-life. Current Out of Service Date is 2016 including obsolescence management and solutions. No other party has the necessary technical expertise and knowledge required to modify the equipment as the modifications cannot be undertaken without access to proprietary design information.
As the contracted DA, any modifications developed by a third party would have to be underwritten by SAAB AB resulting in disproportionate technical and safety difficulties for the MOD along with a disproportionate impact on time and cost in order to provide MOD with the necessary assurances the system safety and performance had not been compromised.
Additional information: To view this notice, register as a supplier here:
http://www.contracts.mod.uk/delta/signup.html?userType=supplier
and search for the notice with reference 'UK-Bristol: Repair and maintenance services of military electronic systems.'.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Nov 2016 | Award (award) | · | 34eb45f4-75c1-43e6-9b24-36a737bef47e-86035 |
more from Ministry of Defence, Land Equipment, Armoured Vehicles Programmes - Artillery Systems Programme
- HAAIP Hydrogas 3rd Generation Upgrade and Refurbishment · £24,000,000 · 18 Dec 2020
- HAAIP Hydrogas 3rd Generation Upgrade and Refurbishment · £24,000,000 · 17 Dec 2020
- Lightweight Counter Mortar Radar (LCMR) Q-49 Support · £9,000,000 · 19 Sept 2020
- Bulldog Crane Valve Block and Modification Kits · £350,000 · 12 Sept 2020
- SERPENS RFI 2 · £400,000,000 · 9 Mar 2020
- SERPENS RFI 2 · £400,000,000 · 7 Mar 2020
- Manufacture and Support of Mobile Artillery Battlefield Radar (MAMBA) Mid-Life Extension (MLE) · £46,000,000 · 20 Jan 2020
- Manufacture and Support of Mobile Artillery Battlefield Radar (MAMBA) Mid-Life Extension (MLE) · £46,000,000 · 19 Jan 2020
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- JSENS/00199 LEAPP In Service Support Contracts Finder Awarded Contract · Ministry of Defence · £19,284,450
- CBRN Training Equipment (CBRNTE) · Ministry of Defence · £638,499
- Provision of Support for Mission Aircrew Optical Trainer (MAOT) · Ministry of Defence · £33,000
- Maintenance and Calibration Services for RAF Police Evidential Breathalysers · Ministry of Defence · £39,737
- The Provision of In-Service Support for Gentex headsets · Ministry of Defence · £369,600
- Repair and Refurbishment of Optical Electrical and Electronic Components and Associated Assemblies · Ministry of Defence · £4,950,000
- In-Service Support to WIZARD & SILVERY - Contract Award Notice · Ministry of Defence · £1,200,000
- DNO/227 Repair of Tactical Engagement System Equipment · Ministry of Defence · £35,634
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.