gvtcx

Lower Itchen Options Appraisal

Environment Agency Published 6 Feb 2025 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£87,573
Statuscomplete
Category (CPV) 90700000
Deadline10 Jan 2025
Contract start3 Feb 2025
Contract end30 Aug 2025
Procedureselective
SME suitableNo
OCIDocds-b5fd17-3e277dda-09b8-4410-b5dd-6203f792444b

Award

SupplierValueDateStatus
Ove Arup & Partners Limited Primary £87,573 3 Feb 2025 active

description

The River Itchen SSSI/SAC is an internationally renowned chalk stream, and despite being highly designated, is in unfavourable condition. One reason being the condition of the physical channel, and another linked to the status of the Itchen Atlantic salmon population, now deemed to be in crisis and at high risk of extinction.

The Lower Itchen, at Woodmill, Southampton, has been significantly modified historically to manage water for navigation, milling, and fishing activities. As a result of this, there are several water control structures: a sluice gate, 2 penstocks, and a sea door that are near the end of their design-life, and a technical fish pass (known as a Denil plain baffle fish pass).

In addition, upstream, the true right bank, retaining the river in an artificial, perched state through Riverside Park, is increasingly permeable and has developed large breaches. This allows a significant proportion of the river to drain from its main (artificial) channel to follow a more natural course through the floodplain. There is an increasing risk that the whole river will continue to change course over time, and this will be expediated through bank failure.

There are multiple partners with both interests and legal requirements to protect, restore & enhance, and increase the resilience of the designated features of the Lower Itchen. Southampton City Council (SCC) own the structures, and a large extent of adjacent wetland and parkland; and they own Fishing Rights on the river from the Salmon Pool to Gaters Mill.

SCC lease some of the wetland area (including a lake) to Active Nation for educational, water sports and fishing activities. The Environment Agency (EA) has an interest in the management and condition of the river, particularly regarding abstraction, flood risk, biodiversity, water quality and fish passage.

Southern Water (SW) have an interest in the availability of water for abstraction, particularly during low flow and drought conditions. SW have a requirement to put in place a package of mitigation measures to offset environmental impacts from abstraction pursuant to a Lower Itchen Drought Order.

Portsmouth Water also abstract for public water supply at Gaters Mill, upstream of the A27.

There have been several technical studies undertaken to date, including a Woodmill Project (Options Appraisal) study, 2016 (Appendix B), which primarily focused on easing fish passage. However, several changes since this date, for example, the Monks Brook weir (a major impediment to fish passage) has collapsed; 50% of flow is now going through the main breach (on the true right hand bank); sea level rise predictions have changed, the status of Itchen Salmon has deteriorated; climate-change impacts are increasingly evident through storms, surges, flooding, low flows and drought; and the number of small breaches in the true right bank are increasing in size.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
6 Feb 2025 Award (award) · 3907218a-74ac-4096-a6f9-b412475d0531-824055

more from Environment Agency

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.