Value£750,000
Statuscomplete
Category (CPV) 45310000
Deadline5 Oct 2022
Contract start17 Oct 2022
Contract end31 Mar 2023
Procedureopen
SME suitableYes
OCIDocds-b5fd17-3c5f4385-8220-4e9d-b4af-f2340b3b0954

Award

SupplierValueDateStatus
SEAKING ELECTRICAL LIMITED £730,000 13 Oct 2022 active

description

In 2017 the HMS Warrior Preservation Trust merged with the National Museum of the Royal Navy (NMRN), following the merger the NMRN conducted surveys of Warrior's electrical systems and identified that it requires extensive rewiring work. Previously in 2018 a tender was advertised but was not awarded following feedback from the submitted bids.

The ship and its systems host a staff presence 24/7 across the whole year, with members of the public visiting during opening hours of Portsmouth Historic Dockyard. The ship hosts events on board throughout the year, with catering for events being supplied by the fully equipped professional kitchen on board the ship. The ship maintains numerous systems such as; a macerator, speaker, fire detection, lighting and ventilation systems alongside the public-facing role. This tender is intended to help support the current and future power requirements of the NMRN onboard HMS Warrior.

The NMRN is seeking to rewire HMS Warrior to bring all electrical systems on board up to standard, this is across the ship and partially to the jetty alongside Warrior. The scope of work that suppliers will be required to replace and update includes;

-Removal and replacement of the existing electrical circuits onboard including; LV/Small Power Systems
-Removal of existing Fire Alarm and commissioning new Fire Alarm System (to L5 standard and L1 performance) across the ship.
-Removal and Installation of a new ship-wide PA System
-Removal and Updating of CCTV System
-Replacement of HVAC Ventilation System Wiring and Controls
-Provisions to replace and update the Mast Downlights and fittings for Seasonal Lighting (Foremast Christmas Tree lights).
-Requirement to refurbish approx. 150-period accurate replica light fittings; including updating to LED lighting and rewiring to reinstall and reuse.

These requirements may change in scope so this is currently indicative of at the time of writing. Full details can be found in the documentation attached to this tender.

The NMRN is using a JCT Design & Build Contract for this tender, please see the attached Annex C appendixes for further details.

The NMRN encourage all interested suppliers to attend a site visit to see HMS Warrior and throughout the ship in order to further understand the requirements of the NMRN Tender.

Site Visits may be booked via tenders@nmrn.org.uk and should give at least two working days to make arrangements.

The dates to book a site visit are;

Wednesday 21st September Thursday 22nd September Friday 23rd September (Morning Only)

All clarification questions should be sent to tenders@nmrn.org.uk, with responses released throughout the clarification period.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
3 Nov 2022 Award (award) · 4f8f5fbc-9cbc-48fe-9ab0-b00c70cb0308-586470

more from THE NATIONAL MUSEUM OF THE ROYAL NAVY

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.