gvtcx

Area 3 Asset Support Contract Awarded

Highways England Published 18 Nov 2019 Contracts Finder

key details

Value£120,000,000
Statuscomplete
Category (CPV) 45233139
RegionSouth East
Deadline30 May 2012
Contract start1 Nov 2013
Contract end31 Oct 2021
Procedureopen
SME suitableNo
OCIDocds-b5fd17-3b3a59f3-d6bb-4fc9-80fb-9bd0086142fa

Award

SupplierValueDateStatus
Kier Highways Ltd £120,000,000 10 Jun 2013 active

description

Routes for Roads Maintenance, Renewal and Improvement elements, and Technology Renewal and Improvement elements:

A3 from a point approx. 2km south of M25 at Ockham I/C (Surrey) south to its junction with the A3(M) (Hampshire) including operation and maintenance of the twin bore Hindhead tunnel. M3 from a point approx. 2km south of M25 at Kitsmead Bridge (Surrey) south to its junction with the M27 (Hampshire). A3(M) in its entirety (Hampshire). A303 from its junction with M3 Junction 8 (Hampshire) west to its junction with the A338 (Hampshire/Wiltshire boundary line).

M4 from Junction 5 (Berkshire) to M4 Junction 15 (Wiltshire). A404(M) from M4 Junction 8/9 to A404 (Berkshire). A404 from A404(M) (Berkshire) to M40 Junction 4 (Buckinghamshire). A308(M) from M4 Junction 8/9 to A308 (Berkshire). A34 from M3 Junction 9 (Hampshire) to M40 Junction 9 (Oxfordshire). M27 from Junction 1/A31 Cadnam, Hampshire to A27 Hilsea, east of Junction 12, Portsmouth (incl. slips to M275 - Tipner Bridge). M271 from Junction A3057 Romsey Road Rdbt, Hampshire (north of M27) to Redbridge Rdbt, Southampton (south of M27). A27 from M27 Hilsea (east of the M275 link to Portsmouth) to A259 Junction Warblington, Hampshire. A31 (Hants) from M27 Junction 1/A31 Cadnam, Hampshire to Kins Stream Bridge (west of Ringwood, A338 Ashley Heath Junction). A31 (Dorset) from Kings Stream Bridge (west of Ringwood, east of A338 Ashley Heath Junction) to A35/A31 Junction Bere Regis, Dorset. There is potential for parts of the network to be passed to the neighbouring HA area commissions/Local Authorities during the lifetime of the Contract.

Co-location with, facilities for and supervision/management of the Highways Agency Regional Technology Maintenance Contract (RTMC)for the South East in Areas 3 and 4. The RTMC (SE) Network in Areas 3 and 4 is listed below:

Area 3

A3 from a point approx. 2km south of M25 at Ockham I/C (Surrey) south to its junction with the A3(M) (Hampshire) including operation and maintenance of the twin bore Hindhead tunnel. M3 from a point approx. 2km south of M25 at Kitsmead Bridge (Surrey) south to its junction with the M27 (Hampshire). A3(M) in its entirety (Hampshire). A303 from its junction with M3 Junction 8 (Hampshire) west to its junction with the A338 (Hampshire/Wiltshire boundary line). A34 route within Hampshire boundary only. M27 from Junction 1/A31 Cadnam, Hampshire to A27 Hilsea, east of Junction 12, Portsmouth (incl. slips to M275 - Tipner Bridge). M271 from Junction A3057 Romsey Road Rdbt, Hampshire (north of M27) to Redbridge rdbt, Southampton (south of M27. A27 from M27 Hilsea (east of the M275 link to Portsmouth) to A259 Junction Warblington, Hampshire. A31 (Hants) from M27 Junction 1/A31 Cadnam, Hampshire to Kins Stream Bridge (west of Ringwood, east of A338 Ashley Heath Junction). There is potential for parts of the network to be passed to neighbouring HA Area commissions/Local Authorities during the lifetime of the contract. Routes that are covered

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Nov 2019 Award update (awardUpdate) · 9c36c3e0-608a-4303-b5b6-a02fe07c6b7d-326855

more from Highways England

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.