gvtcx

CEFAS22-135 RFQ for a Feasibility Study

Defra Network eTendering Portal Published 14 Nov 2022 Contracts Finder

key details

Value£20,000
Statusactive
Category (CPV) 71241000
RegionEast of England
Deadline28 Nov 2022
Contract start1 Dec 2022
Contract end31 Mar 2023
Procedureopen
SME suitableYes
OCIDocds-b5fd17-3aafa6b5-2c9c-4fcd-a199-d8f9ba6b14a0

description

The Fisheries Act 2020 states as one of its objectives that "the fishing capacity of fleets is such that fleets are economically viable but do not overexploit marine stocks." (2b). In a similar fashion, the 25-year environment plan aims to ensure that food (including fish) is produced sustainably and profitably. Concepts such as capacity, sustainable production and profitability are defined in economics by productivity theory. Within this theory, simplified, it is stated that production is sustainable if it is technically efficient, and resources are not wasted. Technical efficiency can be measured as well as productivity indicators of a fleet segment generated. Hence, to ensure that the newly established Fisheries Management Plans (FMP) will lead to sustainable fishing also in economic terms as well as the capacity of the fishing fleet is aligned, a productivity assessment of the UK fishing fleet segments would be needed.

To be able to assess what kind of indicator and method to generate productivity measures for the UK fleet and how these will be impacted by the newly established FMP, a feasibility study should help in the first instance to understand what indicators would be best suited and what data is already available.

Therefore the successful Tenderer is required to undertake a feasibility study that will be a literature review on current methods internationally used on:

  1. how to measure productivity (capacity, technical efficiency) including Data Envelopment Analysis (DEA) and Stochastic Frontier Approach (SFA) and;
  2. which indicators of the ones found in stage 1 are best equipped to measure productivity changes.

It is expected that in the feasibility study the successful Tenderer will highlight the data need for each method reviewed and based on UK data availability, recommend the most feasible way to measure the productivity (and changes) of UK fleet segments.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
14 Nov 2022 Tender (tender) · b46c21b1-f273-4dcc-97e0-117577252708-589465

more from Defra Network eTendering Portal

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.