Heat Network Integrated Studies - ESPO Renewable Energy Solutions Framework (2838) Lot 2 Direct Award
key details
| Value | £220,000 |
|---|---|
| Status | complete |
| Category (CPV) | 09300000 +7 more |
| Region | South West |
| Deadline | 1 Jul 2019 |
| Contract start | 1 Sept 2019 |
| Contract end | 8 Aug 2020 |
| Procedure | direct |
| SME suitable | Yes |
| OCID | ocds-b5fd17-39f34c37-ebf9-4d6a-9238-0f5b3040d041 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Sustainable Energy Ltd | £220,000 | 6 Aug 2019 | active |
description
BCC are installing heat networks across the city in order to support the Mayor's commitment for Bristol to be a carbon neutral city by 2050 and to reduce fuel poverty. To date BCC social housing blocks have been connected to the network and the Energy service has planned for the expansion of the network to extend to non BCC buildings such as offices, residential units, student housing and hotels. Studies will deliver the following: 1. Assessment of integration of city-wide networks. Feasibility study into the integration of the city's network clusters to include consideration of all previous work to assess the potential for installing a city ring main, the connecting pipe routes, key crossings and constraints, futureproofing of the network, updating of carbon reduction trajectory and identification of key locations for safeguarding of the heat network. 2. Detailed feasibility and concept design for the Temple area with consideration of 5G/ambient loop solution for University of Bristol on Temple Island. 3. Heat Network feasibility studies - Bristol City Centre, Spike Island and Easton. Use of previous work including master planning work to be used to assess these areas for zero carbon heat solutions, such as potential for mine water and use of the floating harbour and also the consideration of combined heat and power. The measure of success of this project will be the delivery of reports which can be used to inform decisions on where to move design onto the next stage e.g. detailed feasibility/detailed design.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 7 Aug 2019 | Award (award) | · | 79fc9fb0-186a-4028-aa9d-d44186d1322d-306455 |
more from Bristol City Council
- Real Time Suicide Surveillance System (RTSS) · £47,756 · 23 Jul 2026
- White Hall Residential New Build · £6,966,000 · 3 Jul 2026
- South Bristol Cemetery Expansion - Professional Services · £125,664 · 3 Jul 2026
- Shared AVC Salary Sacrifice Scheme for Employee Pensions · £440,000 · 30 Jun 2026
- JNC Chief Officer Job Evaluation · 26 Jun 2026
- BCC Website Maintenance and Support · £200,000 · 25 Jun 2026
- Provision of rare languages · £60,000 · 25 Jun 2026
- Employee Salary Sacrifice Scheme (Green Car/Bike) · 25 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PfH - Responsive Repairs, Disrepair Works and Void Services · Procurement for Housing · £725,000,000
- Supply of Metered Electricity · NORTHERN IRELAND WATER LIMITED · £534,000,000
- Provision of Air Source Heat Pump Systems and Solar Photovoltaic Arrays for Four Children and Family Hubs in Leicestershire · Leicestershire County Council · £98,507
- Utility provider Electricity · mhs homes group · £955,868
- Heating Replacement Works - Phase 2 · SHARE MULTI ACADEMY TRUST
- Installation of Air Source Heat Pump System at Fleetdown Community Centre, Dartford · Dartford Borough Council
- The Flexible Procurement and Supply of Half Hourly Electricity · ASSOCIATED BRITISH PORTS · £185,000,000
- The Keys Academy Trust – Fixed Electricity & Gas Supply Products - Contract Award · The Keys Academy Trust · £253,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.